General Inspection | 7/31/2012 | 7/31/2012 | 7/31/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 7/31/2012 | 7/31/2012 | 7/31/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/13/2012 | 6/13/2012 | 6/13/2012 | | PART |
Clint A Smith
|
|
|
Waiting for hydro seeding with a mulch tachifier blend to establish with a vegitative growth.
|
Site Preparation | 4/26/2012 | 4/26/2012 | 4/27/2012 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign where visable from the street.
|
Issue & PRINT to be Invoiced | | | 4/23/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 4/20/2012 | | 4/20/2012 | | DONE |
Clint A Smith
|
|
|
ESC plan narrative revision approved
|
Routing - Erosion and Sediment | 4/12/2012 | | 4/12/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00246 plan approved with conditions attached to the permit.
|
Application received | | | 3/20/2012 | | DONE |
Barbara Stitt
|
|
|
|