Site Final | 9/7/2012 | 9/10/2012 | 9/10/2012 | A | PASS |
Jim Sly
|
|
|
Tony phone Einstien oilery
|
DOC - Permit Finaled | 9/10/2012 | 9/10/2012 | 9/10/2012 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 8/7/2012 | 8/7/2012 | 8/8/2012 | P | FAIL |
Clint A Smith
|
|
|
Must stabilize the lot across from the project area where the landscape contractor utilized for stock piling and completed a final grade of the lot.
|
BMP Violation | 7/10/2012 | 7/12/2012 | 7/13/2012 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 7/10/2012 | 7/10/2012 | 7/10/2012 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: Clean up all sediment and debris off of the hard surfaces. Provides a contauinment for the mortar mixer also clean up all mortar overflow residual surrounding the mortar mixer. Failure to comply with the notice, wil result in further enforcement can occur but not limited to a Stop Work Order may be issued. Will re-inspect on 7/12/2012 AM.
|
Site Preparation | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | PART |
Jim Sly
|
|
|
John phone OK ,.......but need to protect drain at West side of lot. Notified John.
|
BMP Violation | 5/15/2012 | 5/18/2012 | 5/18/2012 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 5/15/2012 | 5/15/2012 | 5/15/2012 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment and debris off of all hard surfaces. PRovides a concrete washout pit. Will follow up on 5/18/2012AM.
|
Issue & PRINT permit COM | | | 5/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 4/30/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/9/2012 | | 4/9/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00281 plan approved with conditions attached to the permit.
|
Application received | | | 3/28/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 28 2012 1:19PM
|