Site Final | 5/15/2013 | 5/15/2013 | 5/15/2013 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/15/2013 | 5/15/2013 | 5/15/2013 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 3/19/2013 | 3/19/2013 | 3/19/2013 | P | FAIL |
Kimberly M. Johnson
|
|
|
LM for RP I was onsite for inspection; Conference with Mike gave verbal: sweep gutters; gater gaurd not installed correctly; trash; maintain washout; maintain material storage prior to next rain (scheduled tonight); entrance used on adjacent lot on south side must either have clean rock installed or stop using it.
|
Aging Inspection | 2/7/2013 | 2/7/2013 | 2/7/2013 | | PART |
Clint A Smith
|
|
|
need to clean up hard surfaces. Inspector 450 discussed over the matter with the GC.
|
Random Inspection | 9/24/2012 | 9/24/2012 | 9/24/2012 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Mike Jordan
|
|
|
|
Issue & PRINT permit COM | | | 9/20/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/19/2012 | | 4/19/2012 | | DONE |
Clint A Smith
|
|
|
ESC12-00289 plan approved with conditions attached to the permit.
|
Application received | | | 3/29/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2012 1:45PM
|