General Inspection | 6/22/2012 | 6/22/2012 | 6/22/2012 | | DONE |
Clint A Smith
|
|
|
Permit Finaled.
|
DOC - Permit Finaled | 6/22/2012 | 6/22/2012 | 6/22/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/7/2012 | 6/7/2012 | 6/7/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/23/2012 | 5/23/2012 | 5/24/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/8/2012 | 5/8/2012 | 5/8/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 4/5/2012 | 4/5/2012 | 4/9/2012 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 4/2/2012 | | DONE |
|
|
|
|
Telephone call | | | 3/30/2012 | | DONE |
|
|
|
Spoke with the project rep. and explained to him the there is a stipulations with the dewatering activity.
"If turbid water is generated while the dewatering process is occuring, you shall stop all dewatering activities and contact both permiting agencies (City of Boise ESC and ACHD storm water) for further requirements to miniumize the discharge of turbid water into the storm drain system."
|
Routing - Erosion and Sediment | 3/30/2012 | | 3/30/2012 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver with dewatering plan approved with conditions attached to the permit. Additional condition is added to the permit.
"If turbid water is generated while the dewatering process is occuring, you shall stop all dewatering activities and contact both permiting agencies (City of Boise ESC and ACHD storm water) for further requirements to miniumize the discharge of turbid water into the storm drain system."
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/2012 | | |
|
|
|
|
Telephone call | | | 3/30/2012 | | DONE |
Christina Prado
|
|
|
called Paul and gave fees due and advised permit is ready
|
Permit Ready to Issue | | | 3/30/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 3/29/2012 | | DONE |
Barbara Stitt
|
|
|
|
General Inspection | 4/20/2012 | 4/20/2012 | | | |
Clint A Smith
|
|
|
|
Routing - Erosion and Sediment | 3/29/2012 | | | | |
Clint A Smith
|
|
|
|