Site Final | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | PASS |
Jim Sly
|
|
|
Rick phone
|
DOC - Permit Finaled | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 10/2/2012 | 10/2/2012 | 10/2/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 9/7/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 9/5/2012 | 9/5/2012 | 9/5/2012 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 7/12/2012 | 7/12/2012 | 7/12/2012 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 7/11/2012 | 7/11/2012 | 7/11/2012 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 6/29/2012 | 7/2/2012 | 7/3/2012 | A | PASS |
Clint A Smith
|
|
|
Verbal to demo contractor and the IRP;
Conduct daily site clean up. Make sure to surpress dust when demolition is occuring on the structure. Once the storm drainage bed is install to protect it.
|
Issue & PRINT permit COM | | | 6/29/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/23/2012 | | 4/23/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00362 plan approved with conditions attached to the permit.
|
Application received | | | 4/18/2012 | | |
|
|
|
|