Site Final | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | PASS |
Dixie Fellows
|
|
|
job is complete
|
General Inspection | 2/15/2013 | 2/15/2013 | 2/15/2013 | | PEND |
Dixie Fellows
|
|
|
ready to final
|
General Inspection | 1/15/2013 | 1/15/2013 | 1/15/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/13/2012 | 12/13/2012 | 12/13/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/12/2012 | 11/12/2012 | 11/13/2012 | | CANC |
Steven Webb
|
|
|
Holiday
|
General Inspection | 10/12/2012 | 10/12/2012 | 10/12/2012 | | PART |
Kimberly M. Johnson
|
|
|
Slope where daylight drain was installed needs stabilized by Monday (30% chance of rain). Spoke to RP and will be done tomorrow 10/13
|
General Inspection | 8/9/2012 | 8/9/2012 | 8/9/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Stabilize slope where daylight drain was installed and perform street sweeping as neccessary.
|
Random Inspection | 7/9/2012 | 7/9/2012 | 7/9/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 6/13/2012 | 6/13/2012 | 7/2/2012 | | PART |
Tony Young
|
|
|
work in progress
|
Site Preparation | 5/10/2012 | 5/11/2012 | 5/11/2012 | A | CANC |
Mike Jordan
|
|
|
|
Site Preparation | 4/27/2012 | 4/27/2012 | 5/9/2012 | | PEND |
Tony Young
|
|
|
|
Issue & PRINT permit SFD | | | 4/24/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 4/20/2012 | | 4/23/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00387 plan approved with conditions attached to th permit.
|
Application received | | | 4/20/2012 | | DONE |
Barbara Stitt
|
|
|
|
General Inspection | 9/11/2012 | 9/11/2012 | | | |
Eric Strole
|
|
|
|