Site Final | 8/31/2012 | 8/31/2012 | 8/31/2012 | A | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/31/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Jim Storey
|
|
|
|
BMP Violation | 8/27/2012 | 8/29/2012 | 8/30/2012 | | PART |
Clint A Smith
|
|
|
Site will have all stabilization measures inplace by 8/31/2012
|
General Inspection | 8/27/2012 | 8/27/2012 | 8/27/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Correction notice issued and left a message for the RP. Sediment/trackout onto road, construction materials staged on public ROW, no perimeter controls.
|
General Inspection | 6/20/2012 | 6/20/2012 | 6/20/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/18/2012 | 5/18/2012 | 5/21/2012 | | PASS |
Dave Hannah
|
|
|
|
Issue & PRINT permit SFD | | | 5/15/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/2/2012 | | 5/2/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00395 plan approved with conditions attached to the permit.
|
Application received | | | 4/23/2012 | | |
|
|
|
|
General Inspection | 7/25/2012 | 7/25/2012 | | | |
Dave Hannah
|
|
|
|