Site Final | 2/12/2013 | 2/15/2013 | 2/15/2013 | A | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 2/12/2013 | 2/12/2013 | 2/12/2013 | | PART |
Clint A Smith
|
|
|
Verbal to GC; Remove all inlet protection to final out permit. Will rer-inspecton 1/15/2013
|
Aging Inspection | 12/11/2012 | 12/11/2012 | 12/11/2012 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 10/9/2012 | 10/9/2012 | 10/9/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BMP Violation | 6/29/2012 | 7/2/2012 | 7/2/2012 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/28/2012 | 6/28/2012 | 6/29/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal TO RP: Contain the mortar mixing area. Provide a sealed contained washout. Protect the storm drain at the back of the builinging on the street side. Will re-inspect on 7/2/2012.
|
Issue & PRINT permit COM | | | 6/25/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 6/4/2012 | | 6/4/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00501 plan approved with additional conditions attached to the permit.
|
Application received | | | 5/21/2012 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2012 8:17AM
|