Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC12-00569
StatusFinaled
Name ROBERT BRUNO
Site Address 1808 S TRAVERTINE WAY
Project NameBruno Built Homes
Customer Number 
ePlanReviewNo
Description
Boulder Heights
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/12/20136/12/20136/13/2013PPASS
DetailsDave Hannah
DOC - Permit Finaled6/13/20136/13/20136/13/2013APASS
DetailsDave Hannah
Conference6/12/20136/12/20136/12/2013ADONE
DetailsKimberly M. Johnson
Met with John, Bruno Build Superintendent, on site to discuss compliance options. Discussed reason for conference; discussed requirement and options for stabilization and the ongoing maintenance problems with the sprinkler head, rilling and erosion; Discussed sediment discharge to street witnessed on Monday 6/ 10; discussed grading permit/COE vs. ESC permit;
Telephone call  6/12/2013 DONE
DetailsKimberly M. Johnson
Robert Bruno to discuss conference held on site. We discussed the ESC stabilization requirements, difference between erosion controls and sediment controls, ESC permit conditions. Jason Taylor joined conversation to discuss how erosion and sediment control problems have delayed the COE per the grading permit. I reaffirmed the stabilization requirement with Bruno and reitterated that the ESC permit will remain open until vegetation is established.
Change Status (ISS)  6/12/2013 DONE
DetailsChristina Prado
Per Kim Johnson's request 6-12-13
Site Final6/11/20136/11/20136/11/2013PPASS
DetailsDave Hannah
DOC - Permit Finaled6/11/20136/11/20136/11/2013PPASS
DetailsDave Hannah
Site Final6/7/20136/10/20136/11/2013PFAIL
DetailsKimberly M. Johnson
additional sod installed. reported by RP that the disturbed area has been seeded. Weeds growing abundently on southwest side. Still have erosion problems resulting in sedimentation on the sidewalk and street.
Site Final6/5/20136/5/20136/5/2013AFAIL
DetailsKimberly M. Johnson
Site repaired but source of problem with sprinklers not corrected efficiently. Resulted in new rutting at 6 sprinkler heads. sedimentation has collected on sidewalk at corner of Travertine and Windsong.
General Inspection5/30/20135/30/20135/30/2013 PART
DetailsClint A Smith
still in need of stabiling the corner of the lot
Random Inspection4/29/20134/29/20134/29/2013PFAIL
DetailsKimberly M. Johnson
Sod is in place. Remaining dirt has been seeded with fescue. Watering has resulted in the dirt to rill. Evidence of sedimentation onto the side walk and gutter exists. Sediment mostly swept up but was not at the intersection of Travertine and Windsong. Fiber rolls needs replaced with new ones. Cannot final permit until final stabilization is achieved. Spoke with Bruno rep onsite. Followed up with RP via telephone.
General Inspection4/12/20134/12/20134/18/2013 PASS
DetailsDixie Fellows
THEY WERE WORKING ON THE LANDSCAPING AND SOD SO THE SITE WAS A BIT MESSY
General Inspection1/24/20131/24/20131/28/2013 PART
DetailsClint A Smith
Message to RP;
Post ESC sign where visable from the street. Also be ware that sediment barriers need to be maintained prior to the thaw of the snow and soil to prevent sediment run off discharges going off of site.
General Inspection12/24/201212/24/201212/24/2012 PASS
DetailsClint A Smith
No activity
General Inspection11/22/201211/22/201211/23/2012 CANC
DetailsKimberly M. Johnson
Holiday
General Inspection10/22/201210/22/201210/23/2012 PASS
DetailsClint A Smith
General Inspection9/21/20129/21/20129/21/2012AFAIL
DetailsClint A Smith
Verbal to RP:
Post ESC sign where visable from the street.
We discussed over the required perimeter controls. We have come to an agreement;
Must install perimeter contols (that are staged at the back of lot) once all contrate work for the footing and stem walls and the backfill is complete or if we have any forecasted storm events, all perimeter control must be installled.
General Inspection8/28/20128/28/20128/28/2012 NR
DetailsClint A Smith
Issue & PRINT permit SFD  8/23/2012 DONE
Routing - Erosion and Sediment6/14/2012 6/14/2012 PASS
DetailsClint A Smith
ESC12-00569 plan approved with conditions attached to the permit.
Application received  6/7/2012  
General Inspection2/25/20133/12/2013   
DetailsDixie Fellows