Site Final | 11/16/2012 | 11/19/2012 | 11/19/2012 | A | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 11/16/2012 | 11/16/2012 | 11/16/2012 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Remove all storm drain inlet protection assosiated with the project so a site final can be completed.
|
Issue & PRINT permit COM | | | 6/28/2012 | | DONE |
|
|
|
|
Application received | | | 6/18/2012 | | |
|
|
|
|
Routing - Erosion and Sediment | 6/18/2012 | | 6/18/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00601 plan waiver approved with additional conditions attached to the permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 6/18/2012 | | |
|
|
|
|
Telephone call | | | 6/18/2012 | | |
|
|
|
6-18-12 called Brent permit ready ///dld
|