Site Final | 5/29/2013 | 5/29/2013 | 5/29/2013 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/29/2013 | 5/29/2013 | 5/29/2013 | P | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 4/17/2013 | 4/17/2013 | 4/24/2013 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | PART |
Mike Jordan
|
|
|
Overflowing trash bins have been emptied. crews were on site picking up construction debries while on site. RP noted that he has a street sweeper scheduled for late afternoon.
|
BMP Violation | 2/14/2013 | 2/14/2013 | 2/14/2013 | P | FAIL |
Mike Jordan
|
|
|
Remove all silts from street and gutter pan. Empty overflowing trash bins and dispose of all construction debries. Correction notice was issued.
|
Aging Inspection | 12/21/2012 | 12/21/2012 | 12/21/2012 | | PART |
Clint A Smith
|
|
|
Daily clean up is required.
|
Tracking Control | 9/24/2012 | 9/24/2012 | 9/24/2012 | P | PART |
Mike Jordan
|
|
|
Excavation work work in progress. Contractor to sweep hard surfaces as needed to avoid trackout and at end of working day.
|
Random Inspection | 9/14/2012 | 9/14/2012 | 9/14/2012 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 9/13/2012 | 9/13/2012 | 9/13/2012 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 8/30/2012 | 9/6/2012 | 9/6/2012 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Clean up on a daily basis in required to remove all sediment and material off of the hard surfaces.
|
Issue & PRINT permit SFD | | | 8/27/2012 | | |
|
|
|
|
Application received | | | 6/19/2012 | | |
|
|
|
|