Site Final | 5/28/2013 | 5/28/2013 | 5/28/2013 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/28/2013 | 5/28/2013 | 5/28/2013 | P | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 4/4/2013 | 4/4/2013 | 4/4/2013 | | PART |
Clint A Smith
|
|
|
Clean up all residual off of the surrounding area of the vertical construction.
|
Random Inspection | 1/30/2013 | 1/30/2013 | 1/30/2013 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 12/6/2012 | 12/6/2012 | 12/6/2012 | P | PART |
Mike Jordan
|
|
|
Spoke to RP about excessive tracking onto the hard surfaces by framing crew. RP has started sweeping hard surfaces. Noted to RP that he may want to relocate staging area were lumber is located or provide additional top dressing at sataging areas to reduce the amount of trackout. RP will have to monitor situation and keep hard surfaces swept as needed.
|
Random Inspection | 10/10/2012 | 10/10/2012 | 10/10/2012 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 9/13/2012 | 9/13/2012 | 9/13/2012 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 8/30/2012 | 9/6/2012 | 9/6/2012 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Clean up on a daily basis in required to remove all sediment and material off of the hard surfaces.
|
Issue & PRINT permit SFD | | | 8/27/2012 | | DONE |
|
|
|
|
Application received | | | 6/19/2012 | | |
|
|
|
|