General Inspection | 9/30/2013 | 9/30/2013 | 9/30/2013 | | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes.
|
DOC - Permit Finaled | 9/30/2013 | 9/30/2013 | 9/30/2013 | P | PASS |
Andy J. Long
|
|
|
Chetan subdivision is complete with all stabilization and landscaping complete. Houses still for sale, not yet occupied. No further ESC inspections required.
|
General Inspection | 7/29/2013 | 7/29/2013 | 7/31/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 5/27/2013 | 5/27/2013 | 5/28/2013 | | CANC |
Kimberly M. Johnson
|
|
|
Holiday
|
General Inspection | 3/25/2013 | 3/25/2013 | 3/25/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/21/2013 | 1/21/2013 | 1/22/2013 | | CANC |
Kimberly M. Johnson
|
|
|
Holiday
|
General Inspection | 11/20/2012 | 11/20/2012 | 11/20/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/18/2012 | 9/18/2012 | 9/19/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/18/2012 | 7/18/2012 | 7/18/2012 | | PASS |
Clint A Smith
|
|
|
|
Routing - Erosion and Sediment | 7/11/2012 | | 7/12/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00674 plan approved with additional conditions attached to the permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 7/12/2012 | | |
|
|
|
|
Issue & PRINT permit COM | | | 7/12/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/29/2012 | | 7/2/2012 | | FAIL |
Clint A Smith
|
|
|
Must provide a supporting narrative with the ESC plan map. Left a message for the Plan designer on 7/2/2012.
|
Application received | | | 6/29/2012 | | |
|
|
|
|