General Inspection | 10/7/2013 | 10/7/2013 | 10/7/2013 | | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes
|
DOC - Permit Finaled | 10/7/2013 | 10/7/2013 | 10/7/2013 | P | PASS |
Andy J. Long
|
|
|
Goodman Oil demo is complete and site is in active. Pit run and plant vegetation has stabilized soil Any new activity will require a new ESC permit.
|
General Inspection | 9/19/2013 | 9/20/2013 | 9/20/2013 | A | PASS |
Bill VanDegrift
|
|
|
BILL, THIS IS PART OF A DEMO PERMIT..IT'S NEVER BEEN INSPECTED AND I'M NOT SURE WHAT TO LOOK FOR..THANKS
|
General Inspection | 9/17/2013 | 9/17/2013 | 9/19/2013 | | PEND |
Dixie Fellows
|
|
|
SENT TO BILL AS I'M NOT SURE WHAT TO LOOK FOR AND THERE HAVE BEEN NO INSPECTIONS ON THE BUILDING PERMIT
|
General Inspection | 9/2/2013 | 9/2/2013 | 9/10/2013 | | PASS |
Rock A. Hudson
|
|
|
|
General Inspection | 8/16/2013 | 8/16/2013 | 8/20/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/1/2013 | 8/1/2013 | 8/1/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Has not achieved any vegetation yet. Will need to continue maintaining temp stabilization until vegetation grows in. Note: site is contoured inward; little to no risk of runoff
|
General Inspection | 7/17/2013 | 7/17/2013 | 7/17/2013 | | PART |
Clint A Smith
|
|
|
Has not achieved vegitation
|
General Inspection | 7/2/2013 | 7/2/2013 | 7/2/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/17/2013 | 6/17/2013 | 6/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/31/2013 | 5/31/2013 | 5/31/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/16/2013 | 5/16/2013 | 5/17/2013 | | PASS |
Kimberly M. Johnson
|
|
|
site stabilized with temporary measures
|
Conference | 5/1/2013 | 5/1/2013 | 5/1/2013 | P | DONE |
Kimberly M. Johnson
|
|
|
On site conference requested by Ryan. Met to discuss final stabilization options. Talked about City permit requirements versus EPA requirements for vegetative and non-vegetative stabilization.
|
Attached Document | | | 4/30/2013 | | DONE |
Kimberly M. Johnson
|
|
|
SWPPP amendment for final stabilization attached.
|
Telephone call | | | 4/30/2013 | | DONE |
Kimberly M. Johnson
|
|
|
Called Ryan Morgan (PD) to discuss final stabilization requirements. Tackifier is only temporary stabilization method and is not a permanent stabilzation method. Ryan stated material used for clean fill is 3/4" minus. Discussed liability of using materials with fines in it for perm stabilization. Ryan will discuss with owner.
|
General Inspection | 4/25/2013 | 4/25/2013 | 4/25/2013 | | PASS |
Clint A Smith
|
|
|
|
Conference | 4/9/2013 | 4/10/2013 | 4/10/2013 | A | DONE |
Clint A Smith
|
|
|
Gave the options to the RP with Warner Construction on how to tranfer their ESC and CGP permits. Explained first, they must stabilize all disturbed soil (pitrun) prior to conducting the tranfering of the permits to a different party.
|
General Inspection | 4/2/2013 | 4/2/2013 | 4/2/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/1/2013 | 3/18/2013 | 3/18/2013 | A | PASS |
Clint A Smith
|
|
|
Work under the re mitigation portion of the project phase.
|
General Inspection | 3/1/2013 | 3/1/2013 | 3/1/2013 | | DONE |
Clint A Smith
|
|
|
Site will become active in 13 days from todays date. Will re-inspect on 3/18/2013
|
General Inspection | 2/14/2013 | 2/14/2013 | 2/14/2013 | | PASS |
Clint A Smith
|
|
|
NO activity
|
General Inspection | 1/30/2013 | 1/30/2013 | 1/30/2013 | | DONE |
Clint A Smith
|
|
|
No activity
|
General Inspection | 1/15/2013 | 1/15/2013 | 1/15/2013 | | PART |
Clint A Smith
|
|
|
NO activities occuring but sediment controls inplace.
|
General Inspection | 12/31/2012 | 12/31/2012 | 12/31/2012 | | PART |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 12/14/2012 | 12/14/2012 | 12/14/2012 | | PART |
Clint A Smith
|
|
|
Starting the mitagation work with stockpiling of the replacement fill material.
|
General Inspection | 11/29/2012 | 11/29/2012 | 11/29/2012 | | DONE |
Clint A Smith
|
|
|
No activity at this time. Project will become active in the next week to begin the remove and dispose the contaminated soil. After all contaminated soil is removed, it has been instructed by DEQ to back fill using pit run and with compacted lifts.
|
General Inspection | 11/14/2012 | 11/14/2012 | 11/14/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/30/2012 | 10/30/2012 | 10/30/2012 | | PART |
Clint A Smith
|
|
|
Waiting on the mitagation work to continue after the artifact screening in complete.
|
General Inspection | 10/12/2012 | 10/12/2012 | 10/12/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 9/27/2012 | 9/27/2012 | 9/27/2012 | | PART |
Clint A Smith
|
|
|
Still mitigating the property.
|
General Inspection | 9/12/2012 | 9/12/2012 | 9/12/2012 | | PART |
Clint A Smith
|
|
|
Still exploring for artifacts on multiple locations on the project.
|
General Inspection | 8/28/2012 | 8/28/2012 | 8/28/2012 | | PASS |
Clint A Smith
|
|
|
Waiting on the remedigation work to occur.
|
General Inspection | 8/10/2012 | 8/10/2012 | 8/10/2012 | | PART |
Clint A Smith
|
|
|
Most of the demo work is complete. The contractor is starting to begin the removal the contaminated soil. Once that is complete, they will begin the mitagation process.
|
General Inspection | 7/19/2012 | 7/26/2012 | 7/26/2012 | A | PART |
Clint A Smith
|
|
|
|
General Inspection | 7/18/2012 | 7/18/2012 | 7/19/2012 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Install stabilized construction exits at the two locations where there is established accesses. Also contact the erosion control dept. with updates on the schedule of the project due to the midigation activities with the removal of contaiminated soils. Will follow up in one week.
|
Issue & PRINT permit COM | | | 7/12/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/10/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 7/2/2012 | | 7/5/2012 | | DONE |
Clint A Smith
|
|
|
ESC12-00681 plan approved with additional conditions attached to the permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2012 | | |
|
|
|
|
Application received | | | 7/2/2012 | | |
|
|
|
|