Site Final | 1/3/2013 | 1/3/2013 | 1/3/2013 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 1/3/2013 | 1/3/2013 | 1/3/2013 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 8/2/2012 | 8/2/2012 | 8/13/2012 | P | PEND |
Tony Young
|
|
|
|
Site Preparation | 8/3/2012 | 8/3/2012 | 8/3/2012 | P | PART |
Jim Sly
|
|
|
Posted correction notice on window.......Need Sign, washout, sweep hard surfaces, and Contain stockpiled dirt.........Prior to pouring concrete.
|
Application received | | | 7/19/2012 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 7/19/2012 | | DONE |
|
|
|
|
Aging Inspection | 11/30/2012 | 11/30/2012 | | | |
Jim Sly
|
|
|
|