Site Final | 3/29/2013 | 3/29/2013 | 3/29/2013 | P | PASS |
Eric Strole
|
|
|
|
Aging Inspection | 3/21/2013 | 3/21/2013 | 3/21/2013 | | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/16/2012 | 11/16/2012 | 11/16/2012 | P | CANC |
Clint A Smith
|
|
|
|
Random Inspection | 11/16/2012 | 11/16/2012 | 11/16/2012 | A | DONE |
Kimberly M. Johnson
|
|
|
Call Tracy with results. Final landscaping on the lot complete. Construction on the house still in progress. Adjacent lot is owned by another landowner. The adjacent lot appears to have been used for material staging, vehicle traffic, ect and has been disturbed. Must return to pre-existing conditions. Called Tracy to discuss and LM 1:40 PM
|
Random Inspection | 10/18/2012 | 10/18/2012 | 10/18/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 10/18/2012 | 10/18/2012 | 10/18/2012 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 9/14/2012 | 9/14/2012 | 9/14/2012 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 8/31/2012 | 9/5/2012 | 9/5/2012 | P | PASS |
Clint A Smith
|
|
|
perimeter controls (longmont) and washout
|
Site Preparation | 8/31/2012 | 8/31/2012 | 8/31/2012 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Install sediment barriers along Longmont to the vegitation. Provide a washout for future cleanout. Will follow up on 9/5/2012
|
Site Preparation | 8/27/2012 | 8/28/2012 | 8/28/2012 | P | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 8/28/2012 | | DONE |
|
|
|
|
Application received | | | 7/24/2012 | | |
|
|
|
|