Site Final | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | PASS |
Dixie Fellows
|
|
|
job complete...sod back in place
|
General Inspection | 2/15/2013 | 2/15/2013 | 2/15/2013 | | PASS |
Dixie Fellows
|
|
|
ready for final
|
General Inspection | 1/15/2013 | 1/15/2013 | 1/15/2013 | | PART |
Clint A Smith
|
|
|
Could not verify if landscape was complete.
|
General Inspection | 12/14/2012 | 12/14/2012 | 12/17/2012 | | NH |
Clint A Smith
|
|
|
Could not gain access to the property due to being gated.
|
General Inspection | 11/13/2012 | 11/13/2012 | 11/13/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 10/12/2012 | 10/12/2012 | 10/12/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Site Preparation | 9/10/2012 | 9/11/2012 | 9/11/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/7/2012 | 9/7/2012 | 9/10/2012 | | CANC |
Clint A Smith
|
|
|
Re scheduled to 09/11/2012
|
Site Preparation | 8/3/2012 | 8/3/2012 | 8/3/2012 | | NR |
Kimberly M. Johnson
|
|
|
|
Issue & PRINT permit SFD | | | 7/31/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 7/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/27/2012 | | DONE |
Tisha Gallop
|
|
|
called Chuck and told him permit is ready, fee and need RP
|
Telephone call | | | 7/26/2012 | | DONE |
Tisha Gallop
|
|
|
received resubmittals; 2 copies of narrative; put in ESC in box.
|
Routing - Erosion and Sediment | 7/26/2012 | | 7/26/2012 | | PASS |
Kimberly M. Johnson
|
|
|
Approved per conditions and redlines
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/24/2012 | | 7/25/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Telephoned PD to discuss neccessary additions to narrative (drawings looked good). ESC checklist sent to PD 7/25/12 via fax. PD to resubmit 2 copies of narrative.
|
Application received | | | 7/24/2012 | | |
|
|
|
|