Site Final | 3/20/2013 | 3/20/2013 | 3/20/2013 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/20/2013 | 3/20/2013 | 3/20/2013 | P | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 2/6/2013 | 2/7/2013 | 2/7/2013 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | | | 2/5/2013 | A | FAIL |
|
|
|
Correction Notice Posted(Verbal to RP);
1. Clean up all trash debris off of the lot.
2. Clean up all sediment and debris of of all of the hard surfaces.
3. Clean all mortar residual off of the lot.
4. Provide sediment barrier along the alley way.
5. Maintain storm drain inletinlets.
* Failure to comply will result in a stop work order. Will re-inspect on 2/7/2013.
|
Aging Inspection | 1/18/2013 | 1/18/2013 | 1/18/2013 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 11/15/2012 | 11/15/2012 | 11/15/2012 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 11/14/2012 | 11/14/2012 | 11/14/2012 | P | PASS |
Jim Storey
|
|
|
|
Issue & PRINT permit SFD | | | 9/5/2012 | | DONE |
|
|
|
|
Application received | | | 8/14/2012 | | |
|
|
|
|