General Inspection | 12/16/2013 | 12/16/2013 | 12/16/2013 | | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes.
|
DOC - Permit Finaled | 12/16/2013 | 12/16/2013 | 12/16/2013 | P | PASS |
Andy J. Long
|
|
|
Parking lot rehab complete. All curbing and landscaped islands stabilized. SWPPP infromation has been removed from site. No further ESC inspections required.
|
General Inspection | 10/14/2013 | 10/14/2013 | 10/14/2013 | | PASS |
Andy J. Long
|
|
|
SWPPP info and permit still posted. Work looks complete on parking lot and no construction activity. No materials or stockpiles left on site. Approved. BLD has not been finaled.
|
General Inspection | 8/12/2013 | 8/12/2013 | 8/12/2013 | | CANC |
Alan Hauser
|
|
|
|
General Inspection | 6/11/2013 | 6/11/2013 | 6/11/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/9/2013 | 4/9/2013 | 4/9/2013 | | PASS |
Clint A Smith
|
|
|
no activity
|
General Inspection | 2/5/2013 | 2/5/2013 | 2/6/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/4/2012 | 12/4/2012 | 12/4/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 10/1/2012 | 10/1/2012 | 10/1/2012 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 9/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 9/12/2012 | | 9/13/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Plan resubmittals received | | | 9/12/2012 | | DONE |
Kimberly M. Johnson
|
|
|
SWPPP submitted
|
Telephone call | | | 9/11/2012 | | DONE |
Kimberly M. Johnson
|
|
|
Spoke to Brandon McCreary with Galloway Engineering about submittal requirements. Expecting resubmittal 9/12/12. Left message for Brandon to contact Brian Murphey about grading and drainage requirements.
|
Routing - Erosion and Sediment | 8/29/2012 | | 8/30/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Spoke to Jeff at ESI about required revisions/additions. He will contact owner of project to re-submit
|
Application received | | | 8/29/2012 | | |
|
|
|
|