Site Final | 5/13/2013 | 5/13/2013 | 5/13/2013 | P | PASS |
Dixie Fellows
|
|
|
exterior grading and landscape complete
|
General Inspection | 5/10/2013 | 5/10/2013 | 5/13/2013 | | PASS |
Dixie Fellows
|
|
|
landscape done...he will call for bld final as grading is complete as well
|
General Inspection | 4/9/2013 | 4/9/2013 | 4/9/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 3/7/2013 | 3/7/2013 | 3/8/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 2/1/2013 | 2/4/2013 | 2/4/2013 | A | PASS |
Rock A. Hudson
|
|
|
Corrections complete and cleaned up
|
General Inspection | 2/1/2013 | 2/1/2013 | 2/1/2013 | | FAIL |
Rock A. Hudson
|
|
|
8-17-02.4J, E Perimeter front portionnot protected. Called RP David Paul with 24 hours to correct and sceduled a pm insp. to ensure corrections have been made.
|
General Inspection | 1/1/2013 | 1/1/2013 | 1/2/2013 | | PASS |
Rock A. Hudson
|
|
|
Perimeter ok
|
Random Inspection | 11/28/2012 | 11/28/2012 | 11/28/2012 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 11/14/2012 | 11/14/2012 | 11/14/2012 | | PASS |
Daryl Spivey
|
|
|
|
Site Preparation | 10/11/2012 | 10/12/2012 | 10/12/2012 | A | PASS |
Tony Young
|
|
|
|
Complaint Inspection | 10/8/2012 | 10/8/2012 | 10/8/2012 | A | PART |
Kimberly M. Johnson
|
|
|
Complaint construction debri is entering unprotected inlet. Site visit found perimeter controls in place and one drain inlet installed. The adjacent drop inlet was not protected. No evidence of pollutants entering storm drain at the time of inspection. Called RP to request inlet protection in both drains. Will be complete by end of day 10/9
|
Site Preparation | 10/2/2012 | 10/2/2012 | 10/2/2012 | P | PASS |
Kimberly M. Johnson
|
|
|
ESC sign up. Berm in back along parts of ridgeline. Site slopes to front of lot.
|
Issue & PRINT permit SFD | | | 9/26/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/7/2012 | | 9/7/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Application received | | | 9/4/2012 | | |
|
|
|
|