General Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | PASS |
Andy J. Long
|
|
|
New garage is open and in use. The south and west sides which were disturbed are now landscaped and stabilized. BMPs have been removed. No further ESC inspections necessary. BLD permit is still.
|
General Inspection | 12/16/2013 | 12/16/2013 | 12/16/2013 | | PASS |
Andy J. Long
|
|
|
Garage structure is complete. Surrounding area of new garage has had landscaping (trees and curbing) installed and the bare ground has been hydroseeded with tacifier. No corrections at this time. Check status of stabilization next inspection.
|
General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/13/2013 | 9/13/2013 | 9/13/2013 | | CANC |
Bill VanDegrift
|
|
|
|
General Inspection | 7/29/2013 | 7/29/2013 | 7/29/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
General Inspection | 6/11/2013 | 6/11/2013 | 6/13/2013 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 4/22/2013 | 4/25/2013 | 4/25/2013 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/19/2013 | 4/19/2013 | 4/22/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to GC; Place all excess washout into the provided washout pit. Secure the plastic lining on the secondary containment to where it will not be effected by the wind. Will re-inspect on 4/25/2013
|
BMP Violation | 3/4/2013 | 3/4/2013 | 3/4/2013 | P | PASS |
Clint A Smith
|
|
|
All issues corrected`
|
Random Inspection | 2/28/2013 | 2/28/2013 | 2/28/2013 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 2/11/2013 | 2/11/2013 | 2/11/2013 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 1/15/2013 | 1/17/2013 | 1/18/2013 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 1/15/2013 | 1/15/2013 | 1/15/2013 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: 1.Post ESC sign where visable from the street. 2. Install a construcution exit per industry standards at the transition point of the disturb soil and the asphalt. 3. Clean up all tracked materials off of the contraction area onto the roadway. Will re-inspect on 1/17/2013
|
General Inspection | 12/21/2012 | 1/2/2013 | 1/2/2013 | A | CANC |
Clint A Smith
|
|
|
Could not reach the RP
|
General Inspection | 12/18/2012 | 12/18/2012 | 12/21/2012 | | DONE |
Clint A Smith
|
|
|
Could not reach RP possibly due to holidays. Re-scheduled for 1/2/2013
|
Fees Due Hold | 12/15/2012 | | 12/18/2012 | | DONE |
Christina Prado
|
|
|
|
Issue & PRINT permit COM | | | 12/13/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/3/2012 | | 12/3/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - Erosion and Sediment | 10/2/2012 | | 10/3/2012 | | FAIL |
Kimberly M. Johnson
|
|
|
Need submittal of ESC plan or SWPPP. Drawings ok
|
(F) Reprint permit | | | 9/26/2012 | | DONE |
|
|
|
|
Application received | | | 9/6/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 6 2012 1:09PM
|