Aging Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 | | DONE |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | PASS |
Evan Jenkins
|
|
|
Subdivsion 95% built out. Only one home being completed to finish all 17 lots. no esc issues permit still open on house being constructied
|
Aging Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 | | PASS |
Evan Jenkins
|
|
|
|
Aging Inspection | 3/3/2014 | 3/3/2014 | 3/3/2014 | | CANC |
Evan Jenkins
|
|
|
esc group out of town
|
Aging Inspection | 1/1/2014 | 1/1/2014 | 1/2/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
Tracking Control | 11/1/2013 | 11/1/2013 | 11/1/2013 | A | FAIL |
Andy J. Long
|
|
|
Empty lot where subdivision wash out is needs construction entrance. Track out onto sidewalk, street and strip of porous concrete. Called RP to provide verbal correction notice.
|
General Inspection | 9/23/2013 | 9/23/2013 | 9/23/2013 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Very clean. Washout in good condition. Lots not stabilized.
|
Complaint Inspection | 5/21/2013 | 5/22/2013 | 5/29/2013 | A | CANC |
Clint A Smith
|
|
|
Follow up on BMP of pourous pavement.
|
Complaint Inspection | 5/21/2013 | 5/21/2013 | 5/21/2013 | A | PART |
Clint A Smith
|
|
|
LEft a message for RP to concat me over the BMP application for what he implimented for the pourous pavement. Track out in is very minor and no drainage or storm drain structures are threatened. Will follow up on the BMP selection tomorrow.
|
BMP Violation | 4/9/2013 | 4/12/2013 | 4/15/2013 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/9/2013 | 4/9/2013 | 4/9/2013 | | FAIL |
Clint A Smith
|
|
|
VErbal to RP; Re establish a proper concrete washout. Must be lined with visquen. Remove the exsisting washout area and replace it with the approved method. Will re-inspect on 4/12/2013
|
General Inspection | 1/30/2013 | 2/4/2013 | 2/4/2013 | A | PASS |
Clint A Smith
|
|
|
|
Conference | 1/30/2013 | 1/30/2013 | 1/30/2013 | A | FAIL |
Clint A Smith
|
|
|
Verbal corrections to the RP(Justin w/ Gully Excavation); Extent the sediment barrier within the south section of the project along the Boise River. Delinate the construction exit to utilize the the 50ft portion of the exit. Will follow up on 2/4/2013 for corrections.
|
General Inspection | 1/9/2013 | 1/9/2013 | 1/9/2013 | | PASS |
Clint A Smith
|
|
|
Have just begun the project. The only activity that is complete is minor clearing and grubing. No threats of discharges coming off of the project area
|
Issue & PRINT permit SFD | | | 1/2/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/24/2012 | | 9/25/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Permit Ready to Issue | | | 9/25/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 9/25/2012 | | DONE |
Barbara Stitt
|
|
|
Called Todd Blackwell And told him that permit is ready and fees due on 9-25-12 @ 10:15am//BAS
|
Application received | | | 9/24/2012 | | |
|
|
|
|