Site Final | 4/15/2013 | 4/15/2013 | 4/15/2013 | P | NR |
Jim Sly
|
|
|
Natasha Phone #: ###-#### At least side front gable for final.
|
DOC - Permit Finaled | 4/15/2013 | 4/15/2013 | 4/15/2013 | P | PASS |
Jim Sly
|
|
|
|
BMP Violation | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | PART |
Clint A Smith
|
|
|
Clean up on daily basis is required.
|
BMP Violation | 3/5/2013 | 3/6/2013 | 3/6/2013 | A | FAIL |
Clint A Smith
|
|
|
Still working on the other lots. TOld RP to complete by the end of the work day. Will follow up tomorrow.
|
General Inspection | 3/5/2013 | 3/5/2013 | 3/5/2013 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Clean up all trash debris off of the lot. Install sediment controls per manufactures specs. Will re-inspect on 3/6/2013.
|
Site Preparation | 12/12/2012 | 12/12/2012 | 12/12/2012 | P | FAIL |
Jim Sly
|
|
|
Michah (RP)....Corrections.....Do not pour any concrete prior to cleaning up hard surfaces, installing sign. installing straw waddle at sidewalk and providing conc. washout.
|
Issue & PRINT permit SFD | | | 12/6/2012 | | DONE |
|
|
|
|
Application received | | | 11/14/2012 | | |
|
|
|
|