General Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PASS |
Andy J. Long
|
|
|
Construction complete, BLD permit already finaled and house is occupied. Homeowner has left straw wattles installed at the toe of slope while vegetation is establishing itself on hillside. Conditions have been met, no further ESC inspections required.
|
General Inspection | 9/23/2013 | 9/23/2013 | 9/23/2013 | | PASS |
Andy J. Long
|
|
|
Construction is complete. Waddle lining street should remain until front bank is stabized. Site currently in good condition.
|
General Inspection | 8/22/2013 | 8/22/2013 | 8/22/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Final grading for landscaping in progress. Wattles may need replaced soon dependant on final stabilization method
|
General Inspection | 6/21/2013 | 6/21/2013 | 6/21/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/21/2013 | 5/21/2013 | 5/21/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/19/2013 | 4/19/2013 | 4/19/2013 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 3/15/2013 | 3/18/2013 | 3/18/2013 | P | PASS |
Eric Strole
|
|
|
corrections complete
|
BMP Violation | 3/15/2013 | 3/15/2013 | 3/15/2013 | P | FAIL |
Eric Strole
|
|
|
Left verbal via voice mail and written correction to install sediment barriers along the front of project, clean up all dirt and debris off all hard surfaces and gutter pans, install concrete wash out being there is concrete residue in gutter pan all the way to the storm drain inlet and move port-a-pot off side walk and put in an approved location. Have complete by 3-18-13 am. Will reinspect on 13-18-13 pm.
|
BMP Violation | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | PART |
Clint A Smith
|
|
|
Must still contruct a contained washout proir to the next pour date.
|
General Inspection | 3/7/2013 | 3/7/2013 | 3/7/2013 | | FAIL |
Clint A Smith
|
|
|
C/N Posted, Verbal to RP;
Clean up all concrete washout residual. Provide a waashout for future use. Clean up all hardsurfaces of all sediment and debris. Failure to comply will result in further enforcement. Will re-inspect on 3/8/2013
|
Site Preparation | 1/30/2013 | 2/4/2013 | 2/7/2013 | A | PART |
Clint A Smith
|
|
|
Verbal to RP; providde a sediment brrier alond access by the end of work day.
|
Conference | 1/22/2013 | 1/29/2013 | 1/30/2013 | A | CANC |
Clint A Smith
|
|
|
Moved to 2/4/2013 due to weather conditions.
|
General Inspection | 1/22/2013 | 1/22/2013 | 1/22/2013 | | PART |
Clint A Smith
|
|
|
Meeting with the RP on 1/28/2013
|
Issue & PRINT permit SFD | | | 1/17/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 1/3/2013 | | 1/3/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Plan submitted on 11/14/12 re-reviewed and approved with same redlines
|
Routing - Erosion and Sediment | 11/21/2012 | | 11/21/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
Application received | | | 11/14/2012 | | |
|
|
|
|