Site Final | 8/28/2013 | 8/28/2013 | 8/28/2013 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/28/2013 | 8/28/2013 | 8/28/2013 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 7/23/2013 | 7/23/2013 | 7/23/2013 | | PART |
Kimberly M. Johnson
|
|
|
Two days of concrete work left to do; washout is contained on site but is not contained in a centralized pit. Currently working on ROW and driveways so stabilized construction exits have been removed but no issues with tracking at time of inspection. Silt fence along north side has been replaced with curb and cut. ESC sign has been weathered and needs re-written. Water truck on site for dust control; no issues with dust at time of inspection.
|
General Inspection | 6/4/2013 | 6/4/2013 | 6/4/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/19/2013 | 4/19/2013 | 4/19/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/4/2013 | 3/4/2013 | 3/4/2013 | A | PART |
Clint A Smith
|
|
|
BMP's verified. ESC plan does on meet the federal requirements of a SWPPP.
|
Site Preparation | 2/26/2013 | 2/28/2013 | 2/28/2013 | A | NR |
Clint A Smith
|
|
|
|
General Inspection | 2/26/2013 | 2/26/2013 | 2/26/2013 | | CANC |
Clint A Smith
|
|
|
Moved to 2/28/2013
|
Issue & PRINT permit COM | | | 2/20/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 12/6/2012 | | 12/6/2012 | | PASS |
Kimberly M. Johnson
|
|
|
approved with redlines
|
Application received | | | 11/26/2012 | | |
|
|
|
|