Permit Information
Permit NumberESC12-01196
StatusFinaled
Name CHRIS BEITIA
Site Address 1615 W HOWE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Per the attached ESC conditions
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection7/12/20137/12/20137/12/2013 PASS
DetailsKimberly M. Johnson
permit finaled
DOC - Permit Finaled7/12/20137/12/20137/12/2013PPASS
DetailsKimberly M. Johnson
BMP Violation4/26/20134/29/20135/1/2013AFAIL
DetailsKimberly M. Johnson
LM for Chris Beittia who is still listed as RP. New sign on site has Dave Wood's name on it as RP. No efforts to protect canal as of yet.
Telephone call  4/30/2013 DONE
DetailsKimberly M. Johnson
Spoke with Dave Wood. Must update RP with someone who has current liscense and update sign. Must contain and control all paint washout and protect canal just like any other body of water.
BMP Violation4/24/20134/25/20134/26/2013AFAIL
DetailsKimberly M. Johnson
Written CN issued: 1) update RP with someone holding current RP and update sign 2) incorrect ESC permit number is listed on sign 3) paint washout on ground wasn't contained and entered canal. Also see ESC13-00087
Telephone call  4/25/2013 DONE
Steve called back with number to contact at Boise City Canal Company. Talked to Mike with Canal Co. The canal work was done by Boise City Canal. Note that canals are exempt from BCC 8-17 so I will work with RP to establish controls to minimize discharge of pollutants to canal. Mike confirmed the canal discharges to Boise River. Steve working with Dave at Wood River Builders to determine who the RP is.
General Inspection4/22/20134/22/20134/24/2013PFAIL
DetailsKimberly M. Johnson
Irrigation ditch runs thru middle of property and has not been stabilized; water is currently running. Called RP listed on sign (Steve) to discuss agreement with canal company and City requirement to stabilize any water conveyance channel prior to running water thru it. Steve will call me back with the information. Later discovered the RP listed on the sign does not match the RP listed with the permit. Called Chris Beitia: Site shall implement ESC measures as required by canal company and update City ESC sign contact information. Chris RP cert is expired and must be updated. Chris to contact new RP and update permit and will call owner to confirm canal requirements are being met.
Random Inspection2/21/20132/21/20132/21/2013APASS
DetailsJim Storey
Random Inspection2/19/20132/19/20132/19/2013PPASS
DetailsJim Storey
BMP Violation2/14/20132/15/20132/15/2013PPASS
DetailsClint A Smith
BMP Violation2/12/20132/14/20132/14/2013AFAIL
DetailsClint A Smith
Verbal to RP;
Provide sedimentbarrier along the perimeter of the project lots. Install inlet portection on the inlet located on the Michigan st side. Will re-inspect on 2/15/2013
General Inspection2/12/20132/12/20132/12/2013AFAIL
DetailsClint A Smith
Verbal to RP;
Protect the storm drain inlet on Michigan St. Provide sediment barriers alon the perimeeter of the road along back of street. Will re-inspect 2/14/2013
Random Inspection2/11/20132/11/20132/11/2013APASS
DetailsJim Storey
Random Inspection1/10/20131/10/20131/10/2013ACANC
DetailsJim Storey
Site Preparation1/8/20131/8/20131/8/2013PPART
DetailsJim Storey
post sign
Issue & PRINT permit SFD  1/2/2013 DONE
Application received  12/14/2012