General Inspection | 12/17/2013 | 12/17/2013 | 12/17/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 12/17/2013 | 12/17/2013 | 12/17/2013 | P | PASS |
Andy J. Long
|
|
|
Poolhouse complete and surrounding areas have been landscaped and sod installed. No trackout or construction materials at site. BLD permit finaled.
|
Permit Ready to Issue | | | 11/1/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Fees Due Hold | 10/5/2013 | | 11/1/2013 | | DONE |
|
|
|
|
General Inspection | 11/1/2013 | 11/1/2013 | 11/1/2013 | | CANC |
Evan Jenkins
|
|
|
|
Routing - Erosion and Sediment | 10/4/2013 | | 10/4/2013 | | DONE |
Evan Jenkins
|
|
|
Addition of a Seepage Bed with the capacity to handle 340 cfs of stormwater
|
Telephone call | | | 10/4/2013 | | |
|
|
|
10-4-13 called Robert Feldmann Narrative ready to pick up///dld ----contractor picked up 10/4/13 leg
|
General Inspection | 9/16/2013 | 9/16/2013 | 9/16/2013 | | PASS |
Alan Hauser
|
|
|
|
General Inspection | 7/30/2013 | 7/30/2013 | 7/31/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Construction exit on back side. Little bit of washout on ground.
|
Random Inspection | 6/12/2013 | 6/12/2013 | 6/12/2013 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 5/13/2013 | 5/13/2013 | 5/13/2013 | P | PART |
Mike Jordan
|
|
|
Needs to provide concrete wahout.
|
General Inspection | 5/8/2013 | 5/8/2013 | 5/9/2013 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 5/1/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/5/2013 | | 1/6/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Addition of a New Seepage Bed
|
Application received | | | 12/28/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 28 2012 10:45AM
|