Case Summary (ESC) | | | 4/20/2016 | | DONE |
|
|
|
|
Site Final | 10/8/2013 | 10/8/2013 | 10/9/2013 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/9/2013 | 10/9/2013 | 10/9/2013 | A | PASS |
Dave Hannah
|
|
|
|
General Inspection | 9/17/2013 | 9/17/2013 | 9/17/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/16/2013 | 8/16/2013 | 8/20/2013 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 7/16/2013 | 7/16/2013 | 7/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/12/2013 | 6/12/2013 | 6/13/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Written CN left and left voicemail to RP: 1. storm drain needs cleaned out per 5/10 inspection and the adjacent lot being used for the spoil stockpile is not permitted for this project. Come to City Hall to obtain ESC permit
|
Random Inspection | 5/10/2013 | 5/10/2013 | 5/10/2013 | P | FAIL |
Kimberly M. Johnson
|
|
|
Perimeter control needs installed in back and disturbance from roof drain install stabilized. Clean out down gradient storm drain on east side of alto via.
|
General Inspection | 4/25/2013 | 4/25/2013 | 4/25/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/25/2013 | 3/25/2013 | 3/25/2013 | P | FAIL |
Mike Jordan
|
|
|
Provide ESC permit sign and post, provide concrete washout and install bmp's. A writen correction notice was posted on temp. electrical box and a verbal correction notice was given to RP (Don) via phone call. He noted that he would have issues resolved prior to concrete placement.
|
General Inspection | 3/20/2013 | 3/20/2013 | 3/20/2013 | | FAIL |
Rock A. Hudson
|
|
|
8-17-02.1 H No sign posted, 8-17-02.4J, E Wattles delivered but not installed.
|
Issue & PRINT permit SFD | | | 3/13/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/13/2013 | | 2/15/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Application received | | | 2/5/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 5 2013 10:36AM
|