Aging Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 10/29/2013 | 10/29/2013 | 10/29/2013 | P | PASS |
Andy J. Long
|
|
|
Stockpile has been removed/utilized. Now site has construction of townhome occuring which is covered under ESC13-00716.
|
Aging Inspection | 8/28/2013 | 8/28/2013 | 8/29/2013 | | PART |
Bill VanDegrift
|
|
|
move prot a poty out of right of way, remove OSB from side walk. sweep side walk and gutter. protect property line to the north. left message with rp.
|
Issue & PRINT permit SFD | | | 2/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 2/20/2013 | | 2/21/2013 | | DONE |
Kimberly M. Johnson
|
|
|
Per Kim issue general permit with general conditions since this is residential lot. Investigation fee does apply per MIS13-00034.
|
Permit Ready to Issue | | | 2/21/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/21/2013 | | DONE |
Tisha Gallop
|
|
|
called Gene and left voicemail permit is ready and fee due.
|
Site Preparation | 2/25/2013 | 2/25/2013 | 2/20/2013 | | PART |
Kimberly M. Johnson
|
|
|
Pre-permitting conference on site (work was already in progress). Need to provide stabilization within 14 days of inactivity and provide final stabilization at project completion. Trackout controls needed if will continue to drive in and out of site. Post ESC sign.
|
Application received | | | 2/20/2013 | | |
|
|
|
|
BMP Violation | 8/29/2013 | 8/30/2013 | | A | |
Bill VanDegrift
|
|
|
|