Permit Information
Permit NumberESC13-00199
StatusFinaled
Name RANDY REUTZEL
Site Address 4000 E WARM SPRINGS AVE
Project NameHarris Ranch 11
Customer Number 
ePlanReviewNo
Description
Dallas Harris Estates Development 11
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection9/15/20149/15/20149/15/2014 PASS
DetailsAndy J. Long
All infrastructure and streets for Dallas Harris Estates phase 11 is complete with most parcels occupied or in progress with Tahoe Homes - all covered with sepearte ESC permits.
DOC - Permit Finaled9/15/20149/15/20149/15/2014PPASS
DetailsAndy J. Long
Random Inspection7/15/20147/15/20147/15/2014PPASS
DetailsAndy J. Long
Some survey work being conducted in Dallas Harris #11 for either more infrastructure or perhaps plotting the new parcels. No trackout or violations. Will continue to monitor activity.
Aging Inspection6/2/20146/2/20146/2/2014 PASS
DetailsAndy J. Long
Some parcels remain open for new construction. RP for Tahoe Homes maintained DI on alley for phase 11. This permit is for the actual subdivision development/grading/paving by Knife River, but is open to keep an eye on this area of heavy construction and potential for ESC issues.
General Inspection3/31/20143/31/20143/31/2014 PASS
DetailsAndy J. Long
This permit covers Block 36 and majority of house are permitted through Tahoe Homes. Streets, sidewalks, and gutters are clean. Stormwater catch basins have DI protection.

Approved.
General Inspection1/27/20141/27/20141/27/2014 PASS
DetailsAndy J. Long
General Inspection11/25/201311/25/201311/25/2013 PASS
DetailsAndy J. Long
Individual lots now have vertical construction. BMPs are installed. No further development under this permit, but will need to monitor stabilization.
General Inspection9/24/20139/24/20139/24/2013 NR
DetailsAndy J. Long
phase 11 construction yet to begin
General Inspection7/24/20137/24/20137/26/2013 CANC
DetailsKimberly M. Johnson
General Inspection5/22/20135/22/20135/22/2013 NR
DetailsClint A Smith
activities on phase 11 have not begun
Site Preparation3/22/20133/22/20133/22/2013 PASS
DetailsRock A. Hudson
Issue & PRINT permit COM  3/19/2013 DONE
Routing - Erosion and Sediment3/15/2013 3/18/2013 PASS
DetailsKimberly M. Johnson
resubmittals received 3/15. Met with PD 3/18 to redline map with BMPs. Call to Applicant regarding existing disturbance to area.
PLANS/APPL TAKEN TO FRONT DESK  3/18/2013 DONE
Telephone call  3/18/2013 DONE
DetailsChristina Prado
Spoke to Nicole with Knife River - gave fees and advised permit is ready for pick up
Permit Ready to Issue  3/18/2013 DONE
DetailsChristina Prado
Telephone call  3/13/2013 DONE
Spoke with Jeff at Knife River to discuss status of review. Will email Jeff and Symon review comments
Routing - Erosion and Sediment3/12/2013 3/13/2013 FAIL
DetailsKimberly M. Johnson
Reviewed new submittals and issued the following comments via email to Knife River and Syman:
1. The most pressing concern that comes up is that grading has already begun in Phases 10 and 11. What permit is currently covering this disturbance?
2. Section 2.2 indicates the project will discharge to the MS4 however the NOI filed with the EPA states that there will be no discharge to the MS4. Conversations with both of you confirmed that there will be no discharge to the MS4 system. Please correct this in the SWPPP.
3. Table 1 lists Warm Springs Creek as a direct receiving water however, neither the dewatering plan or the map makes any reference to this discharge point. Conversation with Kim at Syman indicated that all water from dewatering will be allowed to infiltrate onsite and there will be no offsite discharge.
4. Section 2.5 discusses Phase II stabilization of the common areas to be completed by August 2013. Please show on the map where these common areas are located. This will give me an idea of how much land will be exposed during the wet weather.
5. Table 2.5 does not list the excavation/trench dewatering as an anticipated allowable non-stormwater discharge.
6. Please insert the new page with the corrected disturbance limits as listed into section 2.3 into the resubmittal.
7. Section 4.10 and 4.11 lists a conveyance channel and sediment basin. Are these for the purposes of construction dewatering? Or are they for the permanent stormwater treatment system? Please clarify and show on the map as applicable.
8. The dewatering practices listed in section 4.13 do not coincide with the dewatering plan.
9. The Dewatering Plan states that all water pumped from the excavations will be pumped to a settling pond. The settling pond size, calculations, location and figures were not included in the submittal. Note this settling pond must be shown on the plan map.
10. The Dewatering Plan indicates that after passing thru the settling basin, the water will be discharged to the subsurface groundwater drainage system that has already been installed on site. Please forgive me for not being familiar with this system as I was not involved in the previous permitting. Can you please elaborate? I was under the impression from one of our telephone calls that all water would be allowed to infiltrate on the adjacent property. Is this no longer the case?
11. Page 2 of the Dewatering Plan lists several backup options if the water is still turbid after treatment. Where will the check dams be installed? Please provide installation details and spacing parameters for the check dams.
12. Since these corrections are significant enough that the plans must be resubmitted, please also correct the disturbance areas for each of the phases in section 2.3 in the resubmittal
13. Please submit a new map that is at least 18”x24” that shows all of the BMPs with installation details that will be used during construction. This includes the BMPs for dewatering.
Telephone call  3/12/2013 DONE
Called Nichole at Knife River and LM. Kim from Symon Co returned call. Discussed results of prelim review. Dewatering Plan referenced in plan not included in submittal; Disturbance areas conflicting; Maps included do not all show the same BMPs; BMPs conflicting on map and narrative; Map needs to show where "phase II common areas" are that will be stabilized by August 2013. Narrative indicates discharge to MS4 will occur; NOI does not.
Additional plans submitted  3/12/2013 DONE
Dewatering plan and revised section 2.3 submitted to show actual disturbance amounts
Routing - Erosion and Sediment3/7/2013 3/11/2013 FAIL
DetailsKimberly M. Johnson
Must address the following and resubmit: 1) What phase of Harris Ranch is this project? The documents in the SWPPP reference either 10 or 11. 2) Verify disturbance amount. The application lists 10 acres; the plan lists 20 acres. 3) Dewatering plan not provided for utility trench dewatering and groundwater is not listed as a non-stormwater discharge in Table 2.5. 4) Provide letter of approval from ACHD for dewatering to MS4. 5) Please showcommon areas to be stabilized in phase II on map. 6) Different version of the ESC map were submitted with the SWPPP. LM for Nichole at Knife River
Telephone call  3/7/2013 DONE
DetailsKimberly M. Johnson
Called Nichole at Knife River to notify grading and drainage must be submitted. Cannot issue ESC permit without.
Application received  3/7/2013