General Inspection | 9/30/2013 | 9/30/2013 | 9/30/2013 | | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes
|
DOC - Permit Finaled | 9/30/2013 | 9/30/2013 | 9/30/2013 | P | PASS |
Andy J. Long
|
|
|
Project is complete with stabilization established. All other permits finaled.
|
General Inspection | 8/28/2013 | 8/28/2013 | 8/28/2013 | | PEND |
Dixie Fellows
|
|
|
they havve just started doing the sod and landscaping
|
General Inspection | 7/24/2013 | 7/24/2013 | 7/24/2013 | | PART |
Kimberly M. Johnson
|
|
|
LM for RP: Keep an eye on perimeter control in back; straw wattle was not trenched in but there is wide vegetative buffer down gradient and sod is still in place on upgradient side. Washout is scattered around property and not contained; Must contain washout in centralized pit.
|
BMP Violation | 6/19/2013 | 6/20/2013 | 6/20/2013 | A | PASS |
Tony Young
|
|
|
clean trash from wind storm
|
General Inspection | 6/5/2013 | 6/5/2013 | 6/10/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/2/2013 | 5/2/2013 | 5/2/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
Site Preparation | 3/18/2013 | 3/18/2013 | 3/18/2013 | | PASS |
Rock A. Hudson
|
|
|
|
Issue & PRINT permit SFD | | | 3/15/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 3/11/2013 | | |
|
|
|
|
Routing - Erosion and Sediment | 3/11/2013 | | 3/11/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|