General Inspection | 8/21/2014 | 8/21/2014 | 8/21/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 8/21/2014 | 8/21/2014 | 8/21/2014 | P | PASS |
Andy J. Long
|
|
|
Access road, curbing, sidewalks, and all utility work is complete. 2 of the 3 lots have finished homes. 1 vacant lot remaining is stablized with sheet flow directed to the middle. Vacant lot will require new BLD and ESC permit. ESC conditions satisfied for this scope of work.
|
General Inspection | 7/21/2014 | 7/21/2014 | 7/21/2014 | | PASS |
Evan Jenkins
|
|
|
Still one baren lot left to build a house. 2 homes complete no esc issues at time of inspection
|
General Inspection | 6/19/2014 | 6/19/2014 | 6/19/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/19/2014 | 5/19/2014 | 5/19/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/17/2014 | 4/17/2014 | 4/17/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/17/2014 | 3/17/2014 | 3/17/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/13/2014 | 2/13/2014 | 2/13/2014 | | PASS |
Andy J. Long
|
|
|
No sediment leaving culdesac. Individual homes have seperate permits. Minimal tracking due to muddy conditions, but brooms and cleaning equipment onsite. Contractors parking on pavement and not in the open lot. Approved.
|
General Inspection | 1/13/2014 | 1/13/2014 | 1/13/2014 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress on indiividual lots. No corrections required at this time. Contractors parking on paved street.
|
General Inspection | 12/13/2013 | 12/13/2013 | 12/13/2013 | | PASS |
Andy J. Long
|
|
|
Concrete washout was provided. WIP. Road covered in packed snow, unclear of status of track out noted in previous inspection. No other corrections at this time.
|
General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 | | FAIL |
Evan Jenkins
|
|
|
Correction Notice Posted on Electrical Box Remove Concrete Washouts throughout project (Cleanup and Remove From Site) Designate Appropriate Concrete Lined Washout Sweep Excessive Trackout from Curb, Sidwalk and Road. Post ESC Construction Signs Called Ken (RP) and disclosed multiple BMP violations, and stated he will address violations ASAP. WIll reinspect 11-13-13: Disclosed to RP that if violations are not address/corrected by tomorrow afternoon, a Stop Work Order shall be placed
|
General Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 | | PART |
Andy J. Long
|
|
|
No ESC violations at this time and subdivision development appears complete. Vacant lots have not been stabilized, need to check if any BLD permits have been issued for the new plots. Will discuss plans and stabilization with RP Kent.
|
General Inspection | 9/10/2013 | 9/10/2013 | 9/10/2013 | | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 | | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 7/9/2013 | 7/9/2013 | 7/10/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Lots will need stabilized if inactive
|
General Inspection | 6/5/2013 | 6/5/2013 | 6/5/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/2/2013 | 5/2/2013 | 5/7/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/22/2013 | 3/22/2013 | 3/25/2013 | | PART |
Clint A Smith
|
|
|
Due to work at the access , there will not be a stabilized construction access installed at this time due to utility work. Contractor (Tuffy Ecavation will sweep up any tracked material on a daily basis. If the disturbed soil becomes staturated, there will be no traffic on and off of the project area.
|
Issue & PRINT permit COM | | | 3/19/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2013 | | |
|
|
|
|
Telephone call | | | 3/14/2013 | | DONE |
Christina Prado
|
|
|
called Ken to advise permit is ready for pick up
|
Permit Ready to Issue | | | 3/14/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 3/11/2013 | | 3/12/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Plan approved with redlines, pending grading and drainage. Route to Jason Taylor 3/12/13
|
Application received | | | 3/11/2013 | | |
|
|
|
|