Site Final | 5/21/2014 | 5/21/2014 | 5/21/2014 | P | PASS |
Andy J. Long
|
|
|
Clyde Phone #: ###-####
Finaled. See activity notes.
|
DOC - Permit Finaled | 5/21/2014 | 5/21/2014 | 5/21/2014 | P | PASS |
Andy J. Long
|
|
|
ESC conditions satisfied. Strip of land under power pole will naturally seed itself. No further inspections needed. Trash container will be removed soon.
|
General Inspection | 5/12/2014 | 5/12/2014 | 5/12/2014 | | PASS |
Andy J. Long
|
|
|
House is complete and listed for sale, BLD permit has not been finaled. Construction waste container is still on site. Perimeter outside of lot is compacted but not vegetated. No erosion issues observed.
|
General Inspection | 4/10/2014 | 4/10/2014 | 4/10/2014 | | PASS |
Andy J. Long
|
|
|
Project is nearly complete. Talked to builder/RP Clive Culpan onsite. Will monitor strip of land around perimter to check for proper stabilization. Sidewalk and gutter to be swept tomorrow for this weekend's open house. Approved.
|
General Inspection | 3/10/2014 | 3/10/2014 | 3/10/2014 | | PASS |
Andy J. Long
|
|
|
No corrections at this time. House is in final stages, yard not yet landscaped. Workers staying off mud.
|
General Inspection | 2/6/2014 | 2/6/2014 | 2/6/2014 | | PASS |
Andy J. Long
|
|
|
No corrections required. The sign prohibiting parking in the lot behind house is being obeyed. Permit posted. WIP.
|
General Inspection | 1/6/2014 | 1/6/2014 | 1/6/2014 | | PASS |
Andy J. Long
|
|
|
No corrections at this time. No track out. No off-street parking. Approved.
|
Tracking Control | 12/4/2013 | 12/4/2013 | 12/4/2013 | P | PASS |
Andy J. Long
|
|
|
RP has completed requested corrections from 11/29. Roadway was swept and unauthorized entrance was blocked by a sign and barricade. Visual confirmation and follow-up call from RP
|
Random Inspection | 11/29/2013 | 11/29/2013 | 11/29/2013 | P | FAIL |
Andy J. Long
|
|
|
Trackout observed on sidewalk, Mesa Verde, and small portion of Rhyolite.
Written correction posted at site.
1. Sweep up all trackout in front of site. 2. Provide construction entrance or prohibit parking/driving on the dirt.
Second issue at this site, may require further escalation.
|
General Inspection | 11/26/2013 | 11/26/2013 | 11/26/2013 | | PASS |
Andy J. Long
|
|
|
WIP. No corrections at this time.
|
General Inspection | 10/25/2013 | 10/25/2013 | 10/25/2013 | | PART |
Evan Jenkins
|
|
|
Called Jarrod via cell, disclosed that the equiptment operator ripped a large hole through the silt fence. It needs to be replaced asap. Also, perform some type of dust suppression. 3-4 inches of fluffy dirt throughout site. Wind will carry sediment off site, onto adjacent properties. Water down area.
|
General Inspection | 9/24/2013 | 9/24/2013 | 9/24/2013 | A | FAIL |
Andy J. Long
|
|
|
Repair downhill silt fence along back of property. Trench, backfill, and stake the portion that has collapsed. Called RP Jarrod (###-####) to issue warning/correction notice
|
General Inspection | 7/31/2013 | 7/31/2013 | 7/31/2013 | | PASS |
Rock A. Hudson
|
|
|
Adjacent area has been reseeded
|
BMP Violation | 6/25/2013 | 6/28/2013 | 6/28/2013 | A | PASS |
Kimberly M. Johnson
|
|
|
|
BMP Violation | 6/21/2013 | 6/25/2013 | 6/25/2013 | A | FAIL |
Kimberly M. Johnson
|
|
|
Written correction notice issue: limits of disturbance exceeded approved limits of disturbance. Adjacent property must be returned to pre-existing condition and stablization maintained until vegetation is established. Sweep sediment from gutter; a stabilized construction exit will be required if tracking continues as per plan.
|
BMP Violation | 6/14/2013 | 6/21/2013 | 6/21/2013 | A | FAIL |
Kimberly M. Johnson
|
|
|
Silt fence has been moved to lot line but stabilization has not occurred yet. RP said Ground-FX is scheduled to hydraulically apply seed and mulch on Monday. Will re-inspect 6/25/2013
|
General Inspection | 6/14/2013 | 6/14/2013 | 6/14/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Disturbed past limits of disturbance. Met with RP on site. RP will move silt fence so it is inside property limits and will regrade the disturbed area, seed with a dryland native seed mix and cover with mulch/tackifier blend. RP agreed to re-inspection in one week. RP pointed out house on Rhyolite who was using access off of Rhyolite to drive in boulders to backyard thru back fence. Tracks are consistent with this.
|
Site Preparation | 5/10/2013 | 5/10/2013 | 5/10/2013 | P | PASS |
Jim Sly
|
|
|
Jarrod phone
|
Site Preparation | 5/10/2013 | 5/10/2013 | 5/10/2013 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 5/7/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/21/2013 | | 3/25/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Application received | | | 3/14/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2013 10:22AM
|
General Inspection | 9/2/2013 | 9/2/2013 | | | |
Rock A. Hudson
|
|
|
|