Site Final | 1/6/2014 | 1/6/2014 | 1/6/2014 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 1/6/2014 | 1/6/2014 | 1/6/2014 | P | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 12/26/2013 | 12/26/2013 | 12/26/2013 | | PASS |
Andy J. Long
|
|
|
No yet complete. No ESC violations observed. Trash container has been serviced.
|
Random Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 6/19/2013 | 6/19/2013 | 6/19/2013 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 6/13/2013 | 6/13/2013 | 6/13/2013 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Maintain all sotrm drain inlets and remove all sediment and debris off of the hard surface. Provide a stabilized construction exit where construction bins and material are being stored on the disturbed area of the subdivision. Will follow up once RP schedules another site prep inspection.
|
Issue & PRINT permit SFD | | | 6/13/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 3/14/2013 | | |
|
|
|
|