Permit Information
Permit NumberESC13-00250
StatusFinaled
Name JOHN OLSON
Site Address 3150 W MAIN ST
Project NameDemolition
Customer Number 
ePlanReviewNo
Description
Comercial building
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/13/201311/13/201311/13/2013 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled11/13/201311/13/201311/13/2013PPASS
DetailsAndy J. Long
No further construction activity, project permits already finaled. Demolished building footprint is stabilized with pit run and river rock/gravel material. Not suitable for revegetation. No further ESC inspections required.
General Inspection10/29/201310/29/201310/29/2013 PASS
DetailsAndy J. Long
General Inspection10/11/201310/11/201310/11/2013 PASS
DetailsAndy J. Long
No changes since prior inspection. Disturbed earth is stabilized by pit run, but there is still disturbed earth surrounded by asphalt parking lot. People are driving on the dirt bringing some track out.. Need to discuss whether permit should be finaled.
General Inspection9/26/20139/26/20139/26/2013 FAIL
DetailsAndy J. Long
Demolition complete and BLD, MIS permits are finaled. The building site is still unstabilized, yet contained within the paved parking lot with on-site drainage still protected. More of a fugitive dust potential than sediment in dry conditions. Site should be stabilized unless plans are in works to develop soon.
General Inspection9/11/20139/11/20139/13/2013 PASS
DetailsBill VanDegrift
Site Final8/8/20138/8/20138/8/2013PFAIL
DetailsKimberly M. Johnson
andrea Phone #: ###-####. Cannot final ESC permit until site meets final stabilization requirements or a new permit is issued for the disturbed area.
General Inspection8/1/20138/1/20138/1/2013 PASS
DetailsKimberly M. Johnson
Inlet protection still in good shape. building demo close to complete; still actively working disturbed areas.
General Inspection7/17/20137/17/20137/17/2013 PASS
DetailsClint A Smith
General Inspection7/1/20137/1/20137/1/2013 PASS
DetailsClint A Smith
MOst of the work is compplete
General Inspection6/14/20136/14/20136/16/2013 PASS
DetailsClint A Smith
General Inspection5/24/20135/24/20135/28/2013 PASS
DetailsKimberly M. Johnson
Inlet protection all in good condition (Approx 0.6" rain over last 48 hours).
General Inspection5/9/20135/9/20135/9/2013 PASS
DetailsClint A Smith
All BMP's inplace
Site Preparation4/8/20134/23/20134/23/2013ANR
DetailsClint A Smith
Have not begun
Conference4/8/20134/8/20134/8/2013ADONE
DetailsClint A Smith
Work will not begin on the project except for BMP installation due to the NOI being submitted today. Operator will be waiting 14 calender days. Discussed over sediment controls and where the location of the fueling area will be relocated then where the map indicated.
Site Preparation4/8/20134/8/20134/8/2013 CANC
DetailsClint A Smith
Moved to a confrence
Issue & PRINT permit COM  4/5/2013 DONE
Plan resubmittals received  4/3/2013 DONE
DetailsChristina Prado
received two sets of revised plans and SWPPP; routed to Kim for further review
Routing - Erosion and Sediment4/3/2013 4/3/2013 PASS
DetailsKimberly M. Johnson
PLANS/APPL TAKEN TO FRONT DESK  4/3/2013  
Routing - Erosion and Sediment3/15/2013 3/18/2013 FAIL
DetailsKimberly M. Johnson
Called PD and Applicant. Sent email with comments:
1. Currently, the only BMP between the Boise River and the construction project are drop inlet bags. DI bags (and all sediment controls) should be used as a last resort type of BMP. Please include additional measures to protect dust, debris, sediment, and contaminated stormwater runoff from reaching the catch basins. As discussed, this could include a combination of techniques such as establishing a buffer zone around them, capping the inlets while phasing construction, erosion controls, dust controls, ect.
2. Please expand Section 2.3. Include detail on the final stabilization measures to be implemented and the temporary soil stabilization specifications required for portions of the site that become inactive.
3. Please provide detail for equipment fueling and the maintenance area or they shall be prohibited from occurring on site because of the environmentally sensitive location of the project.
4. The SWPPP references the 2008 CGP which has expired. Please update all references to the 2012 CGP and review section 7 of the CGP to ensure your plan meets the federal requirements.
5. Lastly, please contact Brian Murphy in Public Works to inquire about possible grading plans/application requirements. His direct phone number is ###-####.
Application received  3/15/2013  
General Inspection8/23/20138/23/2013   
DetailsDave Hannah