Permit Information
Permit NumberESC13-00259
StatusFinaled
Name JIM CONGER
Site Address 5752 MILLET DR
Project NameTRIPLETT SUB NO 2
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/10/20159/10/20159/10/2015PPASS
DetailsAndy J. Long
All construction complete. Hillside have vegetated/stabilized. DI bags on Millet have been pulled as requested. Permanent stormwater features complete, all temp BMPs removed except a few degradable wattles on the upper hillside.

No further ESC inspections. Permit conditions satisfied.
Aging Inspection8/31/20158/31/20158/31/2015 PEND
DetailsAndy J. Long
All construction in Tripplett townhome subdivision is complete. All temporary BMPs have been removed except for the two DI bags on Triplett.

Request to remove inlet bags issued in order to Final permit.
Aging Inspection6/29/20156/29/20156/30/2015 PEND
DetailsAndy J. Long
All BMPs removed and hillside stabilized & vegetated. Townhome construction is complete.

1 remaining correction:

Remove DI bags on MS4 storm drains on main section of Millet.

Will advise Tahoe Homes and Conger Development.
Aging Inspection4/27/20154/27/20154/27/2015 PASS
DetailsAndy J. Long
All Triplett townhome parcels are either occupied or vetical construction in progress. Subdivision BMPs installed, including wattles at the toe of slope along back of occupied homes.

No discharges, trackout, or other violations. There is several townhomes in center section that will be ready for final this week as they are being landscaped and cleaned.
Aging Inspection2/23/20152/23/20152/23/2015 PASS
DetailsAndy J. Long
Triplett townhome sub is near completion with the last open parcels under construction. Hillsides that were regraded are now vegetateted. Will keep open until all activity is complete and temp BMPs are removed.
Aging Inspection12/22/201412/22/201412/22/2014 PASS
DetailsAndy J. Long
Townhomes in progress. No drainage or hillside erosion problems occuring after long weekend rain.

Triplett Townhome sub not causing illicit discharges. Approved.
Aging Inspection10/20/201410/20/201410/20/2014 PASS
DetailsAndy J. Long
Triplett Sub development phase is complete. Townhomes are in progress, upper view lots are vegetated. Rocky swale drainage is protected by well established grass and silt fence between the swale and the area of disturbance. Tahoe Homes is using a lined concrete washout pit.

No corrections at this time. Will keep permit open through completion of townhomes.
Aging Inspection8/18/20148/18/20148/18/2014 PASS
DetailsAndy J. Long
Triplett Ranch individual townhomes in progress. Hillsides have stabilized/revegetated around the retaining wall. Will keep permit open to check up on temporary BMPs.
Aging Inspection6/16/20146/16/20146/16/2014 PASS
DetailsAndy J. Long
Aging Inspection4/14/20144/14/20144/14/2014 PASS
DetailsAndy J. Long
Triplett Subdivision BMPs in decent condition. Hillside vegetation is establishing well. Tahoe Homes currently working on individual lots with seperate ESC permits.
Random Inspection2/11/20142/11/20142/11/2014APASS
DetailsAndy J. Long
Hillside inspection. Stabilization and BMPs installed are preventing erosion and trackout to Millet. No large rills or other issues observed. Approved.
Aging Inspection1/15/20141/15/20141/15/2014 PASS
DetailsAndy J. Long
No hillside erosion or channel washouts observed - stabilization and hillside drainage divirsion appear effective. Perimter BMPs prevented muddy runoff onto streets at east end. Some stockpiles in middle of site currently. No corrections at this time.
BMP Violation11/14/201311/15/201311/15/2013APASS
DetailsAndy J. Long
Clint from Tahoe Homes (2 active sites) will place wattles at foot of silt fence. Existing stormwater trench with check dams will capture majority of runoff.

Clint stated fences are to keep contractors/public from driving on and off lots. Crew will install wattles at low spots and sweep roads.

Will check for corrections next inspection in Triplett Ranch.
General Inspection10/29/201310/29/201310/29/2013 PASS
DetailsAndy J. Long
Sudvision development in progress. Some individual sites have began. BMPs implemented and no track out to main part of Millet. The silt fence at east in by sign needs to be trenched in, but after storm yesterday site conditions are approved.
BMP Violation8/23/20138/27/20138/27/2013APASS
DetailsEric Strole
BMP Violation8/22/20138/23/20138/23/2013PFAIL
DetailsEric Strole
Left verbal and written correction that all corrections on previous correction need complete by 8-26-13 pm or a stop work will be issued. Only corrections complete are pot-a-pot moved, concrete cleaned up and esc sign moved. Will reinspect on 8-27-13 am
BMP Violation8/21/20138/23/20138/22/2013PCANC
DetailsEric Strole
General Inspection8/21/20138/21/20138/21/2013 FAIL
DetailsEric Strole
Left verbal via voice mail and written correction to post esc sign to be visible from street, move port-a-pot off sidewalk, clean up all dirt and debris off all hard surfaces and gutter pans, clean up all concrete tha was washed out on ground and install concrete washout pit, protect di's and maintain and protect drainage swall. Have complete by 8-23-13 am. Will reinspect on 8-23-13 pm.
Complaint Inspection6/17/20136/17/20136/17/2013ADONE
DetailsClint A Smith
No water truck on site and could not reach the RP. Explained to the RP's company to discuss the issue with the grading company and surpress the dust with water at the least
Conference5/7/20135/7/20135/8/2013PDONE
DetailsKimberly M. Johnson
Pre-con with Jim Cosslett, Jim Wylie, Jason Taylor, Kelly from Conger Management Group and Jim from Excavator company. wattles installed on north side; ESC sign posted and DI BMPs staged onsite. Excavator will install construction entrance first. Discussed need to monitor straw wattles closely since there is not room for a buffer and construction will need to disturb directly adjacent to them. Also discussed need for all operators to file and NOI.
Issue & PRINT permit COM  5/2/2013 DONE
DetailsBarbara Stitt
Routing - Erosion and Sediment4/9/2013 4/10/2013 PASS
DetailsKimberly M. Johnson
Notified Plan Designer and Responsible Person via email and noted under approval stamp that this ESC plan does not meet federal SWPPP requirements.
PLANS/APPL TAKEN TO FRONT DESK  4/10/2013  
Permit Ready to Issue  4/10/2013 DONE
DetailsChristina Prado
Per Jason Taylor - Esc permit CANNOT be issued until grading permit MIS13-00065 is ready
Plan resubmittals received  4/9/2013 DONE
DetailsTisha Gallop
received two copies of narrative and plans; routed to ESC
Routing - Erosion and Sediment4/1/2013 4/1/2013 FAIL
DetailsKimberly M. Johnson
1. This project is required to submit an NOI to obtain federal NPDES permitting. Please include this notification to the contractor in your plan.
2. This plan does not meet federal SWPPP requirements. I strongly recommend that you review section 7 of the CGP to review the EPA SWPPP requirements, however this will not hold up City permitting.
3. This project will be disturbing fairly significant slopes but there are no perimeter controls. Please explain how sediment will be retained on site in the event of a storm event or approved non-stormwater discharge.
4. The Scope of Project section indicates that the “rear native slopes and lots 19-21 for the most part will be left undisturbed”. Please show the vegetated areas to be preserved and the limits of disturbance on the plan.
5. The Scope of Project sections states that the site has the potential to discharge to the Penitentiary Canal. Please show the location of the this canal on the site map.
6. Keynote 11 on the map states “Protect in place exist. ponds”. Please describe and show on the map how these will be protected.
7. Please include a comprehensive list of pollutant generating activities (e.g. grading, excavation, trenching, saw cutting).
8. Please delete “or onto stockpiles of aggregate base or sand” from The Cement and Concrete Handling section. This is not an approved washout practice.
9. Please note that tracking control procedures can be removed at time of final stabilization and is not required to be in place until building occupancy sign-off as required in BMP Removal Schedule.
Application received  3/19/2013