General Inspection | 12/8/2014 | 12/8/2014 | 12/8/2014 | | PASS |
Andy J. Long
|
|
|
Exterior berm and sidewalk has sufficient amount of native vegetation growing to stabilize the area. Interior berm is to be landscaped by WPS (parcel owners). No sediment leaving site, no MS4 or surface waters adjacent to site. No further ESC inspections necessary at this site. All permits finaled.
|
DOC - Permit Finaled | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/21/2014 | 10/21/2014 | 10/21/2014 | | PASS |
Andy J. Long
|
|
|
Construction activity is complete and BLD is finaled. The landscaped berm and disturbed areas have been seeded but grass/vegetation is not yet established. Will keep permit open to monitor. No ESC violations/corrections.
|
General Inspection | 9/5/2014 | 9/5/2014 | 9/5/2014 | | PASS |
Andy J. Long
|
|
|
No changes or activity at WPS at time of inspection. Still awaiting final landscaping.
|
Conference | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Evan Jenkins
|
|
|
Odie Phone #: ###-#### Discussed Temporary and Perminant Stablization of disturbed areas. Contractor will Tackify disturbed areas for now, and Hydroseed this fall. See will not grow in the summer heat and dry weather.
|
General Inspection | 7/4/2014 | 7/4/2014 | 7/7/2014 | | PASS |
Andy J. Long
|
|
|
Western Power Sports office addition building is near completion. BLD is open. No exterior construction activity observed but some landscaping and/or stabilization of disturbed earth from construction activity to the west of the building and parking lot needs to be completed.
No violations observed.
|
General Inspection | 5/19/2014 | 5/19/2014 | 5/19/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/1/2014 | 4/1/2014 | 4/1/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No sediment leaving site. No MS4 in area
|
General Inspection | 2/14/2014 | 2/14/2014 | 2/14/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues at time of inspection
|
General Inspection | 12/30/2013 | 12/30/2013 | 12/30/2013 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 | | PASS |
Evan Jenkins
|
|
|
|
BMP Violation | 9/24/2013 | 9/24/2013 | 9/24/2013 | A | PART |
Eric Strole
|
|
|
Corrections are complete and stop work has been taken off.
|
BMP Violation | 9/20/2013 | 9/25/2013 | 9/24/2013 | A | CANC |
Eric Strole
|
|
|
|
BMP Violation | 9/23/2013 | 9/23/2013 | 9/23/2013 | A | FAIL |
Eric Strole
|
|
|
Still washing concrete out on ground. A stop work has been issued till all concrete is cleaned up and an approved concrete washout is installed and inspected.
|
BMP Violation | 9/20/2013 | 9/20/2013 | 9/20/2013 | P | FAIL |
Eric Strole
|
|
|
Left verbal with RP to claen up all concrete that washed out on ground and install a concrete washout by 9-23-13 pm. Will reinspect on 9-24-13 am.
|
General Inspection | 9/3/2013 | 9/3/2013 | 9/10/2013 | | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 7/17/2013 | 7/17/2013 | 7/17/2013 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 5/29/2013 | 5/31/2013 | 5/31/2013 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/29/2013 | 5/29/2013 | 5/29/2013 | | FAIL |
Clint A Smith
|
|
|
Message to RP; Install a stabilized construction exit. Will follow up on 5/31/2013
|
Issue & PRINT permit COM | | | 5/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 5/1/2013 | | 5/3/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Approved with redlines. Note plan does not meet federal SWPPP requriements
|
Application received | | | 3/26/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 26 2013 3:16PM
|