General Inspection | 4/15/2014 | 4/15/2014 | 4/16/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | PASS |
Andy J. Long
|
|
|
Cell tower and pre-fab building complete. No ESC violations, no corrections.
|
General Inspection | 2/28/2014 | 2/28/2014 | 3/5/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/13/2014 | 1/13/2014 | 1/13/2014 | | PASS |
Evan Jenkins
|
|
|
BMP's still in place, construction sign still posted. No ESC Violations at time of inspection
|
General Inspection | 11/26/2013 | 11/26/2013 | 11/26/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/8/2013 | 10/8/2013 | 10/8/2013 | | PASS |
Andy J. Long
|
|
|
Work in progress. BMPs installed, permit posted, no track out or discharges. Approved.
|
General Inspection | 8/21/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 8/21/2013 | 8/21/2013 | 8/21/2013 | | PART |
Bill VanDegrift
|
|
|
project is on hold for Idaho Power. Will install protection along 16th street. talked to RP
|
General Inspection | 7/5/2013 | 7/5/2013 | 7/10/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/20/2013 | 5/20/2013 | 5/20/2013 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 5/17/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/29/2013 | | 3/29/2013 | | PASS |
Kimberly M. Johnson
|
|
|
WAIVER APPROVED
|
Application received | | | 3/27/2013 | | |
|
|
|
|