Site Final | 11/27/2013 | 11/29/2013 | 11/29/2013 | A | PASS |
Andy J. Long
|
|
|
RP Dan ####-####
Finaled. See activity notes.
|
DOC - Permit Finaled | 11/29/2013 | 11/29/2013 | 11/29/2013 | P | PASS |
Andy J. Long
|
|
|
Sidewalk and street area in front of townhouse have been swept. DI bags have been replaced to keep protection for projects on adjacent lots per agreement with RP Dan. ESC conditions satisfied.
|
General Inspection | 10/30/2013 | 10/30/2013 | 10/30/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/11/2013 | 9/11/2013 | 9/11/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PART |
Kimberly M. Johnson
|
|
|
Verbal to RP: Stabilize stockpile in back; write in correct. DI along Woody has filter fabric; will need approved DI protection before rainy season. Filter fabric in DI must be replaced with approved DI BMP if construction is still active in rainy season; okay for now. Job site is clean.
|
Site Preparation | 6/3/2013 | 6/3/2013 | 6/4/2013 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/16/2013 | 5/16/2013 | 5/16/2013 | | PASS |
Clint A Smith
|
|
|
|
Override - Parcel Holds | | | 5/13/2013 | | |
|
|
|
|
Override - Parcel Holds | | | 5/13/2013 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 5/13/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 4/19/2013 | | 4/19/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Approved with redlines. Note this plan does not meet federal SWPPP requirements
|
Application received | | | 4/3/2013 | | |
|
|
|
|