General Inspection | 1/23/2014 | 1/23/2014 | 1/23/2014 | | DONE |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 1/23/2014 | 1/23/2014 | 1/23/2014 | P | PASS |
Evan Jenkins
|
|
|
Re-vegetation Established No ESC Issues Complete
|
General Inspection | 12/23/2013 | 12/23/2013 | 12/23/2013 | | PASS |
Andy J. Long
|
|
|
No violations. Stabilization of surrounding areas in progress. BLD permit is open.
|
Site Final | 11/22/2013 | 11/22/2013 | 11/22/2013 | A | FAIL |
Evan Jenkins
|
|
|
Final inspection with grading inspector; stabilization; adjacent lot issues. Contractor to Straw Mulch or Hydromulch adjacent disturbed lot they staged on that wasn't permitted.
|
Site Preparation | 11/21/2013 | 11/22/2013 | 11/22/2013 | A | CANC |
Andy J. Long
|
|
|
duplicate
|
Site Final | 11/21/2013 | 11/21/2013 | 11/21/2013 | A | CANC |
Andy J. Long
|
|
|
10:00 AM
|
General Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 | | PART |
Evan Jenkins
|
|
|
Verbal Correction Notice: Contacted RP Gary via cell. Landscapers are tracking out sediment from adjacent lot and significant amount of sediment throughout the right-of-way from landscaping/sod laying. Sweep road by end of day today 11-15-13.
|
General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 | | PASS |
Andy J. Long
|
|
|
Using adjacent lot for staging, so will need to be stabilized upon completion. BMPs in place, no ESC violations at time of inspection.
|
General Inspection | 9/12/2013 | 9/12/2013 | 9/13/2013 | | CANC |
Bill VanDegrift
|
|
|
just inspected
|
Site Preparation | 8/9/2013 | 8/9/2013 | 8/9/2013 | P | PASS |
Rock A. Hudson
|
|
|
general inspection. corrections done
|
General Inspection | 8/6/2013 | 8/6/2013 | 8/6/2013 | | FAIL |
Rock A. Hudson
|
|
|
8-17-02.4 E,J- Drain inlet protection shall be in place. Called RP and left message. will reinspect Thursday.
|
General Inspection | 7/3/2013 | 7/3/2013 | 7/3/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/9/2013 | 5/10/2013 | 5/10/2013 | A | PASS |
Kimberly M. Johnson
|
|
|
Requested by contractor to see pre-existing erosion control problems at site. Perimeter controls in place and entrance scheduled to go in tomorrow. call Tim with results ###-####. Wattle installed on back slope and berm was left in place at edge of property. signage posted. small washout pool at front; spoke with foundation guy and he will use driveway for washing out in. Will call neighbor (ESC13-00064) to clean out storm drain located across the street because it looks like it's been dirty for longer than this project has been active.
|
Issue & PRINT permit SFD | | | 5/9/2013 | | DONE |
|
|
|
|
Application received | | | 4/22/2013 | | |
|
|
|
|
Routing - Erosion and Sediment | 4/19/2013 | | 4/22/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|