Site Final | 9/24/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Andy J. Long
|
|
|
finaled - see permit activities
|
DOC - Permit Finaled | 9/27/2013 | 9/27/2013 | 9/27/2013 | P | PASS |
Andy J. Long
|
|
|
Parking lot is complete. All other permits finaled. No ESC violations. Approved
|
Site Preparation | 9/24/2013 | 9/24/2013 | 9/24/2013 | P | NR |
Jim Sly
|
|
|
Dave phone
|
Site Final | 9/10/2013 | 9/24/2013 | 9/24/2013 | A | PEND |
Evan Jenkins
|
|
|
Dave......Grade rings.....inlet protection....Out. Contractor not ready for Final Inspection: EEJ
|
Site Final | 9/11/2013 | 9/24/2013 | 9/24/2013 | A | NR |
Jim Sly
|
|
|
Dave..,.,..
|
Site Final | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | NR |
Jim Sly
|
|
|
Dave phone
|
General Inspection | 8/14/2013 | 8/14/2013 | 8/16/2013 | | PASS |
Daryl DeGrange
|
|
|
|
Site Preparation | 6/13/2013 | 6/13/2013 | 6/13/2013 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 6/10/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/28/2013 | | 5/30/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Plan approved. Noted on plan that it does not meet EPA SWPPP requirements per the CGP
|
Application received | | | 4/24/2013 | | |
|
|
|
|