General Inspection | 10/22/2013 | 10/22/2013 | 10/22/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 10/22/2013 | 10/22/2013 | 10/22/2013 | P | PASS |
Andy J. Long
|
|
|
Driveway has been poured. Remodel complete. No activity or permits open. ESC requirements have been met.
|
General Inspection | 9/18/2013 | 9/18/2013 | 9/24/2013 | | CANC |
Eric Strole
|
|
|
|
General Inspection | 8/14/2013 | 8/14/2013 | 8/19/2013 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 7/11/2013 | 7/11/2013 | 7/15/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/6/2013 | 6/6/2013 | 6/6/2013 | | PART |
Clint A Smith
|
|
|
where the excess concrete was washed out is where the driveway will be poured
|
Site Preparation | 5/6/2013 | 5/6/2013 | 5/7/2013 | | NR |
Daryl Spivey
|
|
|
no activity and no one around.,no sign on site........ds
|
Routing - Erosion and Sediment | 5/3/2013 | | 5/3/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Map approved. Narrative waived
|
Issue & PRINT permit SFD | | | 5/3/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 5/2/2013 | | |
|
|
|
|