Aging Inspection | 6/24/2014 | 6/24/2014 | 6/24/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 6/24/2014 | 6/24/2014 | 6/24/2014 | P | PASS |
Andy J. Long
|
|
|
BLD finaled. No further ESC inspections required.
|
Aging Inspection | 4/23/2014 | 4/24/2014 | 4/24/2014 | P | PART |
Andy J. Long
|
|
|
Most structures are complete. Street is now paved and new storm drain facitlities are installed (private system/French drain) Informed RP coconut fiber mats should be installed to protect DIs.
|
Aging Inspection | 4/23/2014 | 4/23/2014 | 4/23/2014 | | CANC |
Andy J. Long
|
|
|
Rescheduled for 4/24
|
Aging Inspection | 2/21/2014 | 2/21/2014 | 2/21/2014 | | PART |
Andy J. Long
|
|
|
3 individual inspections at the Orchards seniors development. No track out to Ustick and no trackout through previously developed areas to Cloverdale. Site is contained.
The curbing and stormwater infrastructure at south end is not yet installed.
Corrections: 1. Clean up washouts at south end 2. Check inlet bags, one new DI does not have protection 3. Shovel sediment/sand trapped at DIs.
Verbal CN given to Travis Perry (RP)
|
Site Preparation | 8/20/2013 | 8/20/2013 | 8/20/2013 | P | PASS |
Jim Sly
|
|
|
Travis phone
|
Issue & PRINT permit SFD | | | 8/8/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/5/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/10/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2013 1:29PM
|