General Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 6/6/2014 | 6/6/2014 | 6/6/2014 | P | PASS |
Andy J. Long
|
|
|
Union Square building #12 is complete and occupied. The phase II parking lots and common areas are complete and landscaped. Staging area across Smoke Ranch has been dismantled and returned to pre-existing conditions. ESC conditions satisfied.
|
Random Inspection | 4/21/2014 | 4/21/2014 | 4/21/2014 | A | PASS |
Andy J. Long
|
|
|
Union Square phases along on Goldking are complete and associated ESC permits are finaled. Final phases at west end along Smoke Ranch are ready for landscaping and some minor construction is ongoing. No violations. Streets look freshly swept.
|
General Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 | | PASS |
Andy J. Long
|
|
|
WIP on buildings and surrounding area in this phase of Union Square. Some minor trackout onto sidewalks, but no discharges or non-compliants stockpiles observed.
RP contact Fred will have sidewalks swept this week.
|
General Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 | | PASS |
Andy J. Long
|
|
|
Smoke Ranch and Goldking being kept clean. No corrections for Union Square at this time.
|
General Inspection | 12/16/2013 | 12/16/2013 | 12/16/2013 | | PASS |
Andy J. Long
|
|
|
Parking area for phase II is now paved. Streets and sidewalks are ice/snow covered. Drop inlets have protection. No corrections at this time.
|
General Inspection | 10/31/2013 | 10/31/2013 | 10/31/2013 | | PART |
Evan Jenkins
|
|
|
Maintain Construction Entrance: Reconstruct Construction Entrance
|
General Inspection | 9/13/2013 | 9/13/2013 | 9/13/2013 | | PASS |
Jim Johnson
|
|
|
|
Site Preparation | 7/29/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 7/18/2013 | 7/18/2013 | 7/19/2013 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 7/9/2013 | | DONE |
|
|
|
|
Additional plans submitted | | | 6/20/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Additional staging area consisting of 0.62 acres requested for north side of Smoke Ranch Drive
|
Routing - Erosion and Sediment | 5/30/2013 | | 6/3/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Approved as noted: 1. The City of Boise requires BMPs are put in place to protect the porous pavement once installed. Phase I of the Union Square Apartments is familiar with this practice and currently uses plastic sheeting and gravel bags or scrap wood to secure it. This practice helps to avoid the need for premature maintenance on the stormwater system.
2. Section 2.5 lists the anticipated non stormwater discharges. These discharges are allowed but must be kept clean. Discharges to the MS4 system (any storm drain owned by ACHD) must first obtain a dewatering permit from ACHD.
|
Application received | | | 5/21/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2013 4:17PM
|