Site Final | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 | | PASS |
Evan Jenkins
|
|
|
Minor trackout. There were 2 workers currently sweeping with hand brooms
|
General Inspection | 1/24/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Andy J. Long
|
|
|
Rescheduled from Friday 1-24
Drop inlets protected. Small amount of track out from foot traffic onto sidewalk but roads and gutters are clean. No corrections at this time.
|
General Inspection | 1/24/2014 | 1/24/2014 | 1/24/2014 | | CANC |
Andy J. Long
|
|
|
Scheduled for Monday 1-27.
|
General Inspection | 1/24/2014 | 1/24/2014 | 1/24/2014 | A | CANC |
Andy J. Long
|
|
|
duplicate entry
|
General Inspection | 12/9/2013 | 12/9/2013 | 12/9/2013 | | PASS |
Andy J. Long
|
|
|
Site has restricted access to limit foot and vehicle track out. Parking lots have been recently paved. Some stockpiles on-site. Limited activity due to snow conditions. No corrections required at this time.
|
General Inspection | 10/23/2013 | 10/23/2013 | 10/23/2013 | | PASS |
Andy J. Long
|
|
|
WIP. No corrections at this time.
|
Site Preparation | 6/26/2013 | 6/26/2013 | 6/26/2013 | P | PASS |
Mike Jordan
|
|
|
|
Issue & PRINT permit COM | | | 6/26/2013 | | |
|
|
|
|
Routing - Erosion and Sediment | 6/19/2013 | | 6/20/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Approved in EPlan as noted:
1. The City of Boise requires BMPs are put in place to protect the porous pavement.
2. Section 2.5 lists the anticipated non stormwater discharges. These discharges are allowed but must be kept clean. Discharges to the MS4 system (any storm drain owned by ACHD) must first obtain a dewatering permit from ACHD.
3. Additional 0.62 acre staging area on north side of Smoke Ranch Drive was approved 6/20/2013
|
Routing - Erosion and Sediment | 5/30/2013 | | 6/3/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Approved as noted: 1. The City of Boise requires BMPs are put in place to protect the porous pavement once installed. Phase I of the Union Square Apartments is familiar with this practice and currently uses plastic sheeting and gravel bags or scrap wood to secure it. This practice helps to avoid the need for premature maintenance on the stormwater system.
2. Section 2.5 lists the anticipated non stormwater discharges. These discharges are allowed but must be kept clean. Discharges to the MS4 system (any storm drain owned by ACHD) must first obtain a dewatering permit from ACHD.
|
Application received | | | 5/21/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2013 4:19PM
|
General Inspection | 9/4/2013 | 9/4/2013 | | | |
Jim Johnson
|
|
|
|