Site Final | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | PASS |
Andy J. Long
|
|
|
Retaining wall is installed and surrounding area stabilized. Drainage channel behind wall has been signed off on by Public Works. No ESC violation; permit conditions satisfied. Triplett Ranch sub permit ESC13-00259 is still open while townhomes are ongoing.
|
DOC - Permit Finaled | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/7/2014 | 10/7/2014 | 10/7/2014 | | PASS |
Andy J. Long
|
|
|
Near completion. Permit posted. No corrections at this time. Lined concrete washout in use, no trackout to Millet.
|
General Inspection | 8/22/2014 | 8/22/2014 | 8/22/2014 | | PASS |
Andy J. Long
|
|
|
Townhome frame is up, no stucco or siding yet. Permit is posted, trash and materials are contained and no trackout or illicit discharges observed. Approved.
|
General Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 | | PART |
Andy J. Long
|
|
|
Frame is up. No trackout or ESC violations. There is no trashbox so pile needs to be picked up to prevent wind carrying away litter.
|
General Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 | | PASS |
Andy J. Long
|
|
|
Disturbed hillsides have vegetated. Some temp BMPs still installed for the Triplett Ranch townhomes (individually permitted). No corrections at this time.
|
General Inspection | 4/4/2014 | 4/4/2014 | 4/4/2014 | | PASS |
Andy J. Long
|
|
|
Retaining wall is complete and has been approved by PW. The slope above is still in process of vegetation. Will keep open until full stabilization is accomplished.
|
General Inspection | 2/17/2014 | 2/17/2014 | 2/17/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 12/31/2013 | 12/31/2013 | 12/31/2013 | | PASS |
Andy J. Long
|
|
|
No further work on wall. Hillside above wall has been hydroseeded but vegetation is not yet established. Hillside has a series of berms to slow runoff. No corrections at this time.
|
General Inspection | 11/13/2013 | 11/13/2013 | 11/13/2013 | | PASS |
Andy J. Long
|
|
|
Wall is constructed as east end of Millet. No permanent or temporary stabilization yet, but hill behind wall is terraced. Approved. BLD permit is open.
|
General Inspection | 9/24/2013 | 9/24/2013 | 9/24/2013 | | PASS |
Andy J. Long
|
|
|
No construction work yet, sites in subdivision have BMPs implemented. No trackout observed, approved.
|
General Inspection | 8/8/2013 | 8/8/2013 | 8/9/2013 | | PASS |
Dave Hannah
|
|
|
|
Issue & PRINT permit COM | | | 7/10/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/19/2013 | | 6/19/2013 | | PASS |
Kimberly M. Johnson
|
|
|
waiver
|
Application received | | | 5/31/2013 | | |
|
|
|
|