Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC13-00552
StatusFinaled
Name RANDY REUTZEL
Site Address 6343 E COLUMBIA RD
Project NameSUNNYRIDGE SUBDIVISION NO. 2
Customer Number 
ePlanReviewNo
Description
Sunnyridge sub #2
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection5/11/20155/12/20155/12/2015APASS
DetailsAndy J. Long
All lots either occupied with completed homes or active projects. DI bags and washout to be maintained by SFH builders (Eaglewood, Hayden, Riverwood, Mansion & Makeovers, Wood Bros)

Open areas stabilized. No further ESC inspections required on this permit. Sunnyridge #3 , see ESC14-00206, is open and actively inspected. Currently in compliance.
DOC - Permit Finaled5/12/20155/12/20155/12/2015PPASS
DetailsAndy J. Long
Aging Inspection5/11/20155/11/20155/11/2015 CANC
DetailsAndy J. Long
rescheduled for 5/12
Aging Inspection3/10/20153/10/20153/10/2015 PASS
DetailsAndy J. Long
Tracking Control1/8/20151/8/20151/8/2015PFAIL
DetailsAndy J. Long
Due to increased construction activity and muddy conditions, roads are very dirty and muddy. When conditions dry out and round of foundations are complete, the following corrections are necessary:

Corrections:
1. Street sweeping (all streets)
2. Check storm drain inlets for onsite system
3. Remove/restore concrete washout

Discussed corrections with Hayden Homes and Eaglewood Homes who will be coordinating with subdivision developer Brad.
BMP Violation11/24/201411/24/201411/24/2014PFAIL
DetailsAndy J. Long
Developer of Sunnyridge needs to provide new washout and clean up existing one.

Work on phase 3 is tracking into Sunnyridge Phase 2 on Snow Bird street and needs sweeping this week.
Random Inspection10/1/201410/1/201410/1/2014PPASS
DetailsAndy J. Long
New lined concrete washout has been installed with signage thoughout development directing concrete trucks to the washout.

Streets and gutters are in good condition - some minor trackout on Snowbird from phase 3 (ESC14-00206). No corrections at this time, just need to continue housekeeping and SWPPP inspections.
BMP Violation9/12/20149/15/20149/15/2014ADONE
DetailsAndy J. Long
Need to replace concrete washout.

Call RPs of Eaglewood (Adam) and Hayden to have new washout provided for next series of houses. Also called developer Brad to alert that a new washout is needed. Will check back later this week...
Tracking Control8/25/20148/28/20148/28/2014PPEND
DetailsAndy J. Long
Need to have developer schedule street sweeper for all Sunny Ridge phase 2 streets.

Adam from Eaglewood Homes is going to request that developer have street sweeper for phase 2 this weekend. Will check back early next week.
General Inspection8/25/20148/25/20148/25/2014 PART
DetailsAndy J. Long
No dust or discharges observed. Streets have trackout from landscaping activities and also construction activities. Will reinspection on Thursday 8/28 to check conditions and issue CN for sweeping as necessary.
General Inspection6/24/20146/24/20146/24/2014PPASS
DetailsAndy J. Long
Follow inspection conducted to check that full washout was cleaned and the pit ready for more use.

Found the washout cleaned and ready for use. Currently it is not lined, but groundwater is very deep and the conditions very hot so will not be a problem.

Correction was made within compliance period.
BMP Violation6/17/20146/17/20146/17/2014PPART
DetailsAndy J. Long
Streets, gutters and sfh projects are staying in compliance with ESC conditions. The main violation observed was the concrete washout which is full. There was no liquified concrete in pit at time of inspection and did not observe any new foundations being poured this week.

Verbal correction to developer Brad M. to provide new washout for upcoming homes. He said it would be completed by early next week. Will check back at that time.

Note: Low risk site, washout not near any surfacae waters or stormwater drainage structures. Just needs to be removed and new lined pit provided.
General Inspection5/26/20145/26/20145/28/2014 CANC
DetailsEvan Jenkins
holiday
Random Inspection3/26/20143/26/20143/26/2014APART
DetailsAndy J. Long
Stormwater infrastructure protection is in good condition.

Need to replace concrete washout. Verbal CN issued to developer Brad who stated he would have the washout replaced by the end of this week with a new installation next week.
General Inspection3/10/20143/10/20143/10/2014 PASS
DetailsAndy J. Long
Subdivision development by Knife River is complete. Individual lots being built on by:
Hayden Homes, Eaglewood Homes, Shiloh Builders, and Riverwood Homes.

Sites have permits posted, some trackout, but all DIs protected. Central cement washout provided . Subcontractors keeping off mud.

Will keep permit open to monitor progress and vacant lots.

Developer contact: Brad Manassian ####-####
Aging Inspection1/8/20141/8/20141/8/2014 DONE
DetailsEric Strole
Complaint Inspection11/8/201311/8/201311/8/2013PPART
DetailsAndy J. Long
Boise ESC Permit posted. Some of the new roads have been laid; subdivision plats are in process of being graded. Cound not find SWPPP on site; some minor areas of track out. No track out to Colombia street. Neighborhood stormwater DIs have filter bags installed.

Corrections:

Keep SWPPP on site
Sweep roads once grading is finished
Tracking Control10/3/201310/3/201310/3/2013PFAIL
DetailsAndy J. Long
No construction entrances for new road work south of existing development.



Corrections required:


1. Construction entrances at Deer Ridge and Bogus Ridge and at end of Snow Bird.

Sweep up track out on streets.


2. Have SWPPP signs and permits posted on site in conspicuous place.

3. Failure to comply may result in a Stop Work Order.

Called RP Randy to discuss corrections
General Inspection9/6/20139/6/20139/10/2013 NR
DetailsBob Reichert
no esc signs, no address, only work going on about 1/2 mile south, not near columbia road, could not find info where doing work
Issue & PRINT permit COM  6/26/2013 DONE
Permit Ready to Issue  6/14/2013 DONE
DetailsChristina Prado
Telephone call  6/14/2013 DONE
DetailsChristina Prado
called Randy to advise permit is ready and gave fees due
Application received  6/11/2013  
Routing - Erosion and Sediment6/11/2013 6/11/2013 PASS
DetailsKimberly M. Johnson
PLANS/APPL TAKEN TO FRONT DESK  6/11/2013