Site Final | 1/22/2014 | 1/22/2014 | 1/22/2014 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 12/24/2013 | 12/24/2013 | 12/26/2013 | | PASS |
Jim Storey
|
|
|
|
Random Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 | P | PASS |
Andy J. Long
|
|
|
BMPs implemented. No track out to surrounding streets. Parking lot is about to be paved. Site looks good.
|
General Inspection | 9/24/2013 | 9/24/2013 | 9/24/2013 | | PASS |
Andy J. Long
|
|
|
Drop inlets protected; excavation and dirt contained within site with curbing. Construction entrance provided. Permit located in job trailer.
|
Issue & PRINT permit COM | | | 7/16/2013 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/2/2013 | | 7/2/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Application received | | | 6/26/2013 | | |
|
|
|
|