Site Final | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 12/5/2013 | 12/5/2013 | 12/5/2013 | | PASS |
Andy J. Long
|
|
|
WIP. No violations observed. Will downgrade site priority due to physical and vegetative barriers between site and canal to the south. On site DI have filter bag protection
|
General Inspection | 11/20/2013 | 11/20/2013 | 11/20/2013 | | PASS |
Andy J. Long
|
|
|
Construction has resumed. ESC permit is posted. No trackout or construction materials in parking lot. On site stormwater structures have DI protection. No corrections at this time.
|
General Inspection | 11/5/2013 | 11/5/2013 | 11/5/2013 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 10/11/2013 | 10/14/2013 | 10/14/2013 | A | PASS |
Evan Jenkins
|
|
|
Todd Phone #: ###-#### Construction sign posted and no ESC Issues currently
|
(F) Reprint permit | | | 10/11/2013 | | DONE |
|
|
|
|
Fees Due Hold | 9/26/2013 | | 10/11/2013 | | DONE |
Christina Prado
|
|
|
|
General Inspection | 9/27/2013 | 9/27/2013 | 9/27/2013 | | PART |
Andy J. Long
|
|
|
No construction activity, no permit sign. There is a waiver fee that needs to be paid. Unclear if project has been stopped
|
Routing - Erosion and Sediment | 9/25/2013 | | 9/25/2013 | | DONE |
Jason C. Taylor
|
|
|
|
Permit Ready to Issue | | | 7/16/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/8/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 8 2013 9:53AM
|
General Inspection | 1/21/2014 | 1/21/2014 | | | |
Jim Sly
|
|
|
|