General Inspection | 12/21/2015 | 12/21/2015 | 12/22/2015 | | PASS |
Andy J. Long
|
|
|
All phases of Aberdeen Square construction is complete. Parking lots and common area are stabilized and landscaped.
DI bags on MS4 inlets on Raymond, Irving, Colehaven and Allumbaugh have been removed.
No further corrections or actions required. ESC permit conditions satisfied.
|
DOC - Permit Finaled | 12/22/2015 | 12/22/2015 | 12/22/2015 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 11/19/2015 | 11/19/2015 | 11/19/2015 | A | NR |
Andy J. Long
|
|
|
All ESC conditions satisfied except:
- temporary BMP removal once construction is complete and disturbed area stabilized.
VM left with Jeremy @ Biltmore Company
|
General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 | | PASS |
Andy J. Long
|
|
|
No further construction. Residents have moved into all new buildings of phase II of Aberdeen Square. Entire subdivision is now built out. Construction equipment, materials and dumpsters removed. No loose sediment or dirt stockpiles.
No immediate stormwater issues, but correction request to remove temp DI bags was issued to Biltmore Company. Will check for Final next general inspection.
|
General Inspection | 9/28/2015 | 9/28/2015 | 9/28/2015 | | PASS |
Andy J. Long
|
|
|
WIP on painting last several units within the new phase at the north end of Aberdeen Square. Open areas have been landscaped and carports are in progress. Some loose dirt from carport work and landscaping with parking lot will be swept once work is complete. Private storm drains and MS4 inlets on Raymond and Colehaven have sediment bags installed.
No trackout or offsite discharges, exterior of project is relatively clean with no litter or debris. Some minor sediment accumulations in gutter can be swept upon completion work and parking lot sweep.
|
General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 | | PASS |
Andy J. Long
|
|
|
WIP on landscaping around new buildings. Storm drains have inlet protection, no trackout, all roads and parking lots are paved and curved. Ongoing projects have trash containment; periodic sweeping is conducted around the perimeter. Approved.
|
BMP Violation | 7/24/2015 | 7/27/2015 | 7/27/2015 | P | PART |
Andy J. Long
|
|
|
Raymond Street. sidewalk, and gutter has been swept and uncontained trash was picked up.
Remaining corrections: - empty full trash/waste containers within site - pick up wind blown litter in swale by north entrance off Raymond
Corrections in progress, good initial response to corrections issued, but site still needs some work.
|
General Inspection | 7/23/2015 | 7/23/2015 | 7/24/2015 | | FAIL |
Andy J. Long
|
|
|
Loose dirt, uncontained trash and building materials along Raymond street. Loose trash, no liquid waste washout provided and messy within apartment complex as well. Stormdrains do have inlet protection.
Corrections: 1. Pick up all uncontained trash and litter around new Aberdeen phase perimeter and within site. 2. Provide additional trash containers/dumpster for site as needed. 3. Empty full trash containers. 4. Sweep Raymond Street. 5. Provide liquid waste washout (lined pit or leakproof container)
Correction issued to Biltmore RP. Will reinspect Monday afternoon
|
General Inspection | 6/22/2015 | 6/22/2015 | 6/22/2015 | | PASS |
Andy J. Long
|
|
|
WIP on newest phases of Aberdeen. Trash is contained. No dumped concrete washout, and receiving DIs have inlet protection. Lots of activity needs regular sweeping. No discharges, trackout, or fugitive dust observed. Approved
|
General Inspection | 5/21/2015 | 5/21/2015 | 5/21/2015 | | PASS |
Andy J. Long
|
|
|
Phase I in Aberdeen Square has all construction finished and all disturbed areas stabilized. Streets are free of loose dirt from construction activity in Phase II.
Phase II on the north side of Colehaven is in progress with vertical and foundation work in progress. Some trackout and stockpiles on hard surfaces at time of inspection. Crews were backifilling foundations and hauling away dirt. All DIs (MS4 on Raymond & private) have sediment capture bags.
No dust, windblown trashout, or trackout of mud. Just need to sweep sidewalks on Raymond when finished backfilling.
|
General Inspection | 4/20/2015 | 4/20/2015 | 4/20/2015 | | PASS |
Andy J. Long
|
|
|
Aberdeen Phase 1 complete, some minor sediment accumulation in gutters should be swept on next routine sweeping. Stormdrains have inlet protection.
Vertical construction in phase 2 has not yet started (permits are in plan review). Area is covered under this permit and sites are ready for construction
|
General Inspection | 3/20/2015 | 3/20/2015 | 3/20/2015 | P | PART |
Andy J. Long
|
|
|
Correction:
Do final sweep of parking lots with all unit finished.
Biltmore supervisor Pat stated that sweeping will be done on Monday concurrently with parking spot striping.
Streets and gutters are fairly clean, DIs have filter bags installed and with remaining capacity.
|
General Inspection | 2/27/2015 | 2/27/2015 | 2/27/2015 | | PASS |
Andy J. Long
|
|
|
Aberdeen Square WIP. Streets have been recently swept, all drop inlets have filter protection. Vertical construction in initial phase is near completion, some areas still require landscaping/stabilization and final clean up in parking alleys.
No vertical construction yet in new phase, roads and utilities installed. Workers building trash enclosures currently. Permits are being process for new 4-plexes which will start this spring.
Will need to install new lined concrete washout and provide extra trash containers.
|
General Inspection | 1/27/2015 | 1/27/2015 | 1/27/2015 | A | PASS |
Andy J. Long
|
|
|
Correction request/notice from last Tuesday 1/20. All streets, parking lots, and gutters around Aberdeen Square were swept on Friday. No new trackout or issues. WIP. Approved.
|
Site Preparation | 1/16/2015 | 1/20/2015 | 1/20/2015 | A | PART |
Andy J. Long
|
|
|
Note: not a site prep inspection....
Aberdeen Square has trash and materials contained, no major trackout leaving the development area, and no dirty runoff or discharges observed.
Correction:
This week as weather warms, Colehaven, Allumbaugh, and Raymod trough the two access drives requires street sweeping and general cleanup.
Verbal correction request made to RP Jeremy
|
General Inspection | 1/16/2015 | 1/16/2015 | 1/16/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
Random Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | PART |
Andy J. Long
|
|
|
Corrections for Aberdeen Square subdivsion development:
1. Install drop inlet protection on the new stormdrain on Raymond at Colehaven. 2. This week the sidewalks and gutters should be swept. No major trackout or issues on roadway, but there is a significant amount of sediment and small debris in gutters and at drop inlets 3. Check capacity on inlet bags and do maintenance as necessary.
RP Jeremy notified of corretions by telephone
Overall site is in pretty good condition with BMPs installed.
|
General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Andy J. Long
|
|
|
BMPs installed at Aberdeen including silt fence perimeters and DI bags; no trackout extending beyond site limits, though some minor trackout within the parking lot due to the wet weather and mud. Contractors parking on hard surfaces. No specific corrections at this time, just advised RP to continue housekeeping and trackout control as conditions improve.
|
General Inspection | 11/27/2014 | 11/27/2014 | 11/28/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
Random Inspection | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | PASS |
Andy J. Long
|
|
|
Aberdeen sub development still in progress. 4 plexes with seperate ESC permits are in compliance. Streets and gutters appear to be recently swept, trash and construction materials are contained;
Correction request to provide new concrete washout for the new phase has been completed and is lined.
No trackout or other BMP violations at time of construction. Workers staying off unpaved dirt areas.
|
Random Inspection | 10/9/2014 | 10/9/2014 | 10/9/2014 | P | PART |
Andy J. Long
|
|
|
Aberdeen Square streets and gutters are in good condition due to regular sweeping. DI protection installed in inlets have remaining capacity. Trash is being contained.
Some trench work on Colehaven has caused some loose sediment on that portion of street. Will be swept/cleaned when patched.
1 Correction: Concrete washout off Irving is about to overflow. Requested an alternative washout be provided ASAP to prevent a spill/breech.
RP Jeremy Amar stated he would take care of it...will check back
|
Random Inspection | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | PART |
Andy J. Long
|
|
|
Streets, gutters, and storm drain inlets are in good condition. Trash and construction materials are being contained through site at Aberdeen Square.
Two Corrections:
There is some trackout to Colehaven due to vehicles not using the rock entrance. The rock used for the construction entrance should be angular to know more dirt of and provide traction.
Verbal request to RP Jeremy to either fix entrance or increase sweeping until road is paved. Looks like underground utilities are complete.
2. Concrete washout is at approximately 70% full and needs to dry out for disposal. New lined pit should be provided ASAP.
|
General Inspection | 9/12/2014 | 9/15/2014 | 9/15/2014 | A | PASS |
Andy J. Long
|
|
|
Aberdeen Square sub is in process of completing final phases of 4-plexes in the older section and installing new utilities & roads for new section on Raymond/Colehaven.
Streets appears to have been swept this weekend while contractors were gone. Permits are posted throughout site, no trackout and more rock is availabe on site to refresh vehicle tracking pads as needed.
No corrections at this time.
|
General Inspection | 9/12/2014 | 9/12/2014 | 9/12/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/12/2014 | 8/12/2014 | 8/12/2014 | A | PART |
Andy J. Long
|
|
|
Grading and preparation for utilities and street have started for Aberdeen Place #4. This new activity is part of the initial 11.5 acre area of disturbance and is covered in the SWPPP. Construction entrance for phase is installed. A new washout will be provided for curb work. A sediment trench lines the perimeter and sheet flow is to the center of the site. If left inactive, will need temporary stabilization.
Corrections for Phase 2: 1. Remove damaged silt fence on Allumbaugh 2. Sweep gutters and sidewalks around the perimeter of phase 2
|
Random Inspection | 7/22/2014 | 7/22/2014 | 7/22/2014 | P | PART |
Andy J. Long
|
|
|
DI bags were maintained as requested on 7/9 CN and it appears Colehaven Street was swept.
Will need to sweep Raymond and Irving street again soon due to sediment and debris in gutter accumulating. Currently there is some landscaping in progress on the Raymond townhomes, so they may attack with some push brooms.
|
Tracking Control | 7/10/2014 | 7/10/2014 | 7/10/2014 | P | PEND |
Andy J. Long
|
|
|
check on corrections status
Litter was picked up and consolidated but DI bags were not yet maintained and streets and gutter have not been swept as requested. Will check with RP tomorrow if no changes and post written CN.
|
General Inspection | 7/9/2014 | 7/9/2014 | 7/9/2014 | P | FAIL |
Andy J. Long
|
|
|
Aberdeen Square is not currently in compliance with regulations.
Corrections needed:
1.The street, sidewalk and gutters on Raymond and Irving (side adjacent to activity) need to be swept 2. Maintain all DIs on Raymond, Colehaven, and Irving (Irving is full) 3. Install perimeter wattles along the south side of project on corner of Raymond and Irving.
Verbal notice provided to RP Jeremy Amar. Compliance is due by end of week. No precipitation forecasted.
|
Random Inspection | 6/18/2014 | 6/18/2014 | 6/18/2014 | A | PASS |
Andy J. Long
|
|
|
Aberdeen Square development and 4-plexes of central phase is in progress. No trackout, contractors parking on hard surfaces. DIs have inlet protection. Permiter wattles & silt fence installed in certain areas.
|
Random Inspection | 5/23/2014 | 5/23/2014 | 5/23/2014 | P | PASS |
Andy J. Long
|
|
|
Aberdeen Square central access alleys and stormwater infrastructure has been installed. Work on individual units along Raymond. Sidewalk is dusty, but street is clean. Drop inlets have protection. Approved.
|
General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 | A | PASS |
Andy J. Long
|
|
|
Aberdeen Square sub development is currently in compliance. The alleyways between Colehaven and Irving are currently being paved. This should provide contractor parking for the new phases occuring on Raymond. DIs have protection, gutters have little sediment accumulation. Silt fence along Allumbaugh is in good condition; SWPPP located at corner of Colehaven & Allumbaugh.
|
General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/2/2014 | 4/2/2014 | 4/2/2014 | | FAIL |
Evan Jenkins
|
|
|
No BMP's present throughout site, nor Drop Inlet Protection. Contacted RP, he stated he will get BMP's installed asap
|
Change Status (ISS) | | | 4/1/2014 | | DONE |
Tisha Gallop
|
|
|
per AJL keep permit open to cover other phases of project.
|
General Inspection | 11/5/2013 | 11/5/2013 | 11/5/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 11/5/2013 | 11/5/2013 | 11/5/2013 | P | CANC |
Andy J. Long
|
|
|
4 plex complete, 11.25 acre site development still in progress with additional phases planned.
|
General Inspection | 9/27/2013 | 9/27/2013 | 9/27/2013 | | PASS |
Andy J. Long
|
|
|
Drop inlets in subdivision are protected. No major areas of unstabilized dirt. SWPPP and signage are on construction sites. Approved.
|
Issue & PRINT permit COM | | | 7/24/2013 | | DONE |
|
|
|
|
Application received | | | 7/8/2013 | | |
|
|
|
|
Routing - Erosion and Sediment | 7/8/2013 | | 7/8/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|